Preventative maintenance,
fans,
air ducts and
heating element
(2 years), continued
External:
Hoses and
duct connections (2
years)
34
continued
Step
8
Ensure that all gaskets are sealed com-
pletely
before replacing the panel.
9
Check that all connections are securely connected to the PCB.
10
Mount the front panel
Visually inspect:
1. The duct connections at the top of the unit must be checked for leaks, which will
appear as dirty areas.
2. Check drain hoses and valves for damage.
See more on page 17.
Ensure that there is water in the hose's siphon.
Action
Illustration