Download Print this page

Tools Required For The Installation - Keysight Technologies N5221B Manual

Hide thumbs Also See for N5221B:

Advertisement

Getting Prepared
Protecting Your Workspace from Electrostatic Discharge
For information, click on the Chapter 1 bookmark, "Electrostatic Discharge
Protection" in the PDF Service Guide
ESD Equipment Required for the Installation
Description
ESD grounding wrist strap
5-ft grounding cord for wrist strap
2 x 4 ft conductive table mat and 15-ft grounding wire
ESD heel strap (for use with conductive floors)

Tools Required for the Installation

Description
T-6 TORX driver - set to 4 in-lbs (0.45 N.m)
T-10 TORX driver - set to 9 in-lbs (1.02 N.m)
T-20 TORX driver - set to 21 in-lbs (2.38 N.m)
5/16-in (8 mm) nutsetter or open end torque wrench- set to 8 in-lbs (0.9 N.m)
5/16-in (8 mm) nutsetter or open end torque wrench - set to 10 in-lbs (1.13 N.m)
5/16-in (8 mm) nutsetter or open end torque wrench - set to 21 in-lbs (2.38 N.m)
3/16-in (5 mm) nutsetter or open end torque wrench - set to 6 in-lbs (0.68 N.m)
5/8-in (16 mm) nutsetter or open end torque wrench - set to 21 in-lbs (2.38 N.m)
1-in (25.4 mm) torque wrench - set to 72 in-lbs (8.15 N.m)
Installation Note N5222-90127
Use a 5/16-in torque wrench set to 10 in-lbs on all cable connections
except the front and rear panel bulkhead connectors. On these, use a 5/16
inch nutsetter or open end torque wrench set to 21 in-lb.
1
.
Keysight Part Number
9300-1367
9300-0980
9300-0797
9300-1308
Qty
1
1
1
1
1
1
1
1
1
9

Advertisement

loading

This manual is also suitable for:

N5222bN5221bu- 661N5222bu- 661N5222-60127