Installation Procedure for the Upgrade
Step 9. Assemble the A26 and A27 Receiver Bridge Assemblies
Follow the instructions shown in
Figure
4. New parts are listed in
Table 2 on
page 11
of this document.
Figure 4
A26 and A27 Receiver Bridge Assemblies (5087-7757, N5242-00006,
0515-0410)
bridge
20
Installation Note N5222-90127