Download Print this page

Keysight Technologies N5221B Manual page 24

Hide thumbs Also See for N5221B:

Advertisement

Installation Procedure for the Upgrade
Step 14. Install the Bulkhead Connectors in the Test Set Front Plate
Refer to
1. Locate the bulkhead connectors you removed earlier from the 2-port test
2. From the back side of the test set front plate, insert a bulkhead connector
3. Install 1x washer and 1x nut. Hand tighten nut and ensure bulkhead
4. Repeat previous two steps for the remaining bulkhead connectors.
5. Torque nuts, on the front side of test set front plate, to 21 in-lbs.
Figure 8
Bulkhead Connectors Installation (1250-3805)
24
Figure 8
for this procedure. New parts are listed in
set front plate of the PNA. Use these and the new bulkhead connectors
included in the kit for the remainder of this step.
into a hole in the plate.
connector hexagon nut, on the back side of test set front plate, is aligned
to the test set subpanel hexagon indent.
Table 2 on page
Installation Note N5222-90127
11.

Advertisement

loading

This manual is also suitable for:

N5222bN5221bu- 661N5222bu- 661N5222-60127