Seal The Supervisor; Table 6: Cellular Gateway Supervisor Battery Switch Options - Geokon GeoNet 8900 Series Instruction Manual

Wireless data hosting system
Hide thumbs Also See for GeoNet 8900 Series:
Table of Contents

Advertisement

12 | NETWORK INSTALLATION | GEOKON
Power Source
Mains or solar with external battery
Solar without external battery

TABLE 6: Cellular Gateway Supervisor Battery Switch Options

FIGURE 13: Cellular Gateway Supervisor Battery Switch
FIGURE 14: Non-Cellular Supervisor Battery Switch
Non-cellular Supervisors 890X-XX-SUP-232, 890X-XX-SUP-USB
Move the battery select switch to either the
depending on the type of battery being used.
Align the positive (+) side of the batteries with the + indicator in the battery
holder. Push the batteries straight down into the holder.
FIGURE 15: Battery Detail

3.2.3 SEAL THE SUPERVISOR

1.
Place the supplied desiccant packs inside the enclosure.
2.
Ensure the cover gasket and the mating ridge on the enclosure are clean,
and that the gasket is properly seated inside the groove on the cover. Place
the cover on the unit.
Geographic Zone
Temperate
Sub Polar
BATTERY
or
ALKALINE
LITHIUM
6:
9-24V
N/A
13:
14:
position
15:

Advertisement

Table of Contents
loading

Table of Contents