Model 8900 Series
GeoNet Wireless Data Hosting System
Quick Start Guide
GEOKON
close proximity to each other, before you deploy them to their respective on-site positions.
For more detailed information than is provided in this Quick Start Guide, please refer to the
Model 8900 Series GeoNet Wireless Data Hosting System Instruction
A network must include a single Supervisor and at least one Node that is within radio range of
the Supervisor. Below is a general outline of the set-up process:
1.
2.
1.
1.1 PREPARE THE SUPERVISOR AND NODES
1.1.1 INSTALL THE ANTENNAS ON ALL DEVICES
Remove the rubber cap from the antenna mount. Position the antenna on the mount and then
rotate the antenna in a clockwise direction until tightened.
Repeat this for each device.
Note: Not applicable to the Cellular Gateway antennas.
1.1.2 REMOVE THE COVERS FROM ALL DEVICES
Remove the cover by unscrewing the four captive screws on the front of the enclosure. Ensure
that no dirt, water, or other contaminants are allowed to enter the enclosure.
Repeat this for each device.
1.1.3 CONFIGURE THE CHANNEL ON ALL DEVICES
GEOKON
no specific network configuration is needed and you can skip to Section 1.2 below.
If multiple networks are within radio range of each other, then each network (up to a limit of 12)
must be configured to use a different channel. Devices of each network must be set to their
respective channel.
1 | QUICK START GUIDE | GEOKON
recommends that you configure your network with all devices at the same location, in
Skipping or omitting steps, or performing them out of
order, could complicate the installation of your network.
Configure the network
Prepare the Supervisor and Nodes
Configure the Supervisor
Activate the network
Deploy the network
Mount and ground the devices
Connect the Nodes to sensors
Link the Cellular Gateway to the Cloud (if used)
CONFIGURE THE NETWORK
configures all devices to use Channel 1; if no other networks operate in the area, then
Manual.