3.
Tighten the cover screws slowly. If an electric screwdriver is used, do not
fully tighten the screws; do the final tightening by hand. Work in a diagonal
pattern.
Important! Make sure the cover seals tightly and evenly.

3.2.4 SET THE NETWORK TIME

Cellular Gateway Supervisors set the network time automatically when they
connect to the cellular network. Non-cellular Supervisors must have their time
set manually, using
GEOKON
Connect the non-cellular Supervisor to the computer using the
USB cable. For RS-232 models, connect the USB cable using the
supplied RS-232 adapter.
Note: For details on setting up a Network in Agent, watch the Agent software
tutorial or refer to the Agent instruction manual. The network will not begin
collecting data until the network time is set.

3.2.5 VERIFY THE NETWORK TIME

Press the Status button to verify that the network time is set. The LEDs should
flash both green and red. If only the red LED flashes:
For Cellular Gateway Supervisors, wait several minutes and try again.
For non-cellular Supervisors, set the network time using Agent.

3.2.6 RECORD THE SUPERVISOR SERIAL NUMBER

The serial number of the Supervisor is required when using Agent software and
when commissioning the cellular gateway.

3.3 ACTIVATE THE NETWORK

3.3.1 POWER THE NODES

Power the Nodes in a manner similar to the process of powering the Supervisor.
Do the following:
1.
Move the battery select switch to either the
depending on the type of battery being used.
2.
Align the positive (+) side of batteries with the + indicator in the battery
holder. Push the batteries down into the holder.
An LED will flash twice, indicating the unit has power.

3.3.2 VERIFY THE NETWORK CONNECTION OF THE NODES

If the Supervisor is in Deployment mode, the Nodes will join the network about
30 seconds after power up, as indicated by the LED(s) on the Nodes flashing in
unison with the Supervisor.
Verify that the LED indicators on the Nodes and the Supervisor are flashing
green only. This may take several minutes depending on network configuration.
DEPLOY THE NETWORK

3.4 MOUNTING THE DEVICES

The attached mounting bracket is designed to be used with U-bolts, hose
clamps, screws, etc. Mount all devices vertically, with the antenna pointing up.
recommends a mounting height of at least two meters. Lower than two
GEOKON
meters may compromise performance; as a rule, higher is usually better.
MODEL 8900 SERIES GEONET WIRELESS DATA HOSTING SYSTEM | NETWORK INSTALLATION | 13
's "Agent" data collection software.
ALKALINE
-supplied
GEOKON
-
GEOKON
or
position
LITHIUM

Advertisement

Table of Contents
loading

Table of Contents