Configure The Supervisor; Power Concerns; Power The Supervisor; Table 5: Channel Selection - Geokon GeoNet 8900 Series Instruction Manual

Wireless data hosting system
Hide thumbs Also See for GeoNet 8900 Series:
Table of Contents

Advertisement

ON = up
OFF = down
FIGURE 12: Channel Select Switches
Channel5:
1
1
OFF (down)
2
ON (up)
3
OFF
4
ON
5
OFF
6
ON
7
OFF
8
ON
9
OFF
10
ON
11
OFF
12
ON

TABLE 5: Channel Selection

3.2 CONFIGURE THE SUPERVISOR

3.2.1 POWER CONCERNS

In a new network, be sure to power the Supervisor before powering the Nodes.
When the unit is powered, a green LED on the right side of the box will flash
twice after a small delay, indicating the unit has power. The LEDs will not flash
again until at least one Node has joined the Network.
Note: Deployment mode starts as soon as devices are powered on or reset. See
Section 3.7 for information on Deployment mode.
Note: If replacing batteries in an existing network, ensure that the network is in
Deployment Mode prior to removing the batteries. See Section 4.3 for more
information on battery replacement.

3.2.2 POWER THE SUPERVISOR

Cellular Gateway Supervisors 890X-XX-LTM-USB, 890X-XX-03G-USB
Move the battery switch to the
chart below. Connect to external DC power, then proceed to Section 3.2.3.
For solar panel information, see Appendix F.
MODEL 8900 SERIES GEONET WIRELESS DATA HOSTING SYSTEM | NETWORK INSTALLATION | 11
2
3
OFF
OFF
OFF
OFF
ON
OFF
ON
OFF
OFF
ON
OFF
ON
ON
ON
ON
ON
OFF
OFF
OFF
OFF
ON
OFF
ON
OFF
or
position, according to the
9-24V
BATTERY
12:
4
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
ON
ON
ON
ON

Advertisement

Table of Contents
loading

Table of Contents