Electrical Installation
A
A
Ground L1
25
B
A
L2
Ground L1
Remove and discard hole knock-out from the side of
the unit (Detail A)
NOTE: Only one punch-out needs to be removed for
0.0 kW and 10.0 kW models.. Both punch-outs must be
removed on the 15.0 kW models for dual service.
Remove the front access panel (Detail A) to expose the
electrical box and incoming Power terminal block (see below)
L2
A
Insert all wires through the
punched out hole(s) and fasten
wires as shown.
The 0kW and 10kW models will
require the use of only one of the
terminal blocks (Block 'A'). The
15kW models will connect the
extra 5kW electric heat to the
remaining terminal block (Block
'B') and separate 30A service.