Nibe GV-HR 130 Series Installer Manual

Nibe GV-HR 130 Series Installer Manual

Ventilation heat exchanger
Hide thumbs Also See for GV-HR 130 Series:

Advertisement

Quick Links

IHB EN 1820-1
431877
Ventilation heat exchanger
NIBE GV-HR 130
INSTALLER MANUAL

Advertisement

Table of Contents
loading

Summary of Contents for Nibe GV-HR 130 Series

  • Page 1 IHB EN 1820-1 INSTALLER MANUAL 431877 Ventilation heat exchanger NIBE GV-HR 130...
  • Page 3: Table Of Contents

    Dimension and ventilation connections Energy labelling Preheating the outdoor air Electrical circuit diagram 5 Electrical connection Contact information Display External connection options SD card 6 Commissioning and adjusting Preparations Filling and venting Start-up and inspection NIBE GV-HR 130 Table of Contents...
  • Page 4: Important Information

    This symbol indicates danger to person or ma- chine . Caution This symbol indicates important information about what you should consider when installing or servicing the installation. This symbol indicates tips on how to facilitate using the product. Chapter 1 | Important information NIBE GV-HR 130...
  • Page 5: Recovery

    No special tools are required for access. Improper disposal of the product by the user results in administrative penalties in accordance with current le- gislation. NIBE GV-HR 130 Chapter 1 | Important information...
  • Page 6: Inspection Of The Installation

    Setting ventilation flow exhaust air level Setting ventilation flow supply air level 1 Setting ventilation flow supply air level 2 Setting ventilation flow supply air level 3 Electricity (page 15) Connections Main voltage Fuses property Earth circuit-breaker Chapter 1 | Important information NIBE GV-HR 130...
  • Page 7: Delivery And Handling

    Leave a free space of 1,000 mm in front of the distribu- tion box and 200 mm in front of the other sides. Because servicing is carried out from underneath, free space of 1,600 mm is recommended below the unit. NIBE GV-HR 130 Chapter 2 | Delivery and handling...
  • Page 8: Supplied Components

    Slacken off the four screws holding the side panel. Move the panel out and downwards. L E K Unscrew all the screws holding the bottom panel. L E K Lift the bottom panel down. L E K Chapter 2 | Delivery and handling NIBE GV-HR 130...
  • Page 9: The Ventilation Heat Exchanger Design

    3 The ventilation heat exchanger design XL33 XL31 BM20 XL32 XL34 HQ11 QN37 EP26 HQ10 XL40 BT21 BT23 BT20 BT22 AA32 BT50 NIBE GV-HR 130 Chapter 3 | The ventilation heat exchanger design...
  • Page 10: Pipe Connections

    Humidity sensor, exhaust air (P1) QN37 Bypass damper Miscellaneous Type plate Designations in component locations according to standard IEC 81346-2. Designations in brackets show the name of the component in the display. Chapter 3 | The ventilation heat exchanger design NIBE GV-HR 130...
  • Page 11: Pipe And Ventilation Connections

    When installing on a wooden roof, a vibration damper is recommended to prevent vibration being transferred. 1202 Ø15 Install the two enclosed roof mountings in the roof. 1205 Move GV-HR 130 into position. Secure GV-HR 130 with screws. NIBE GV-HR 130 Chapter 4 | Pipe and ventilation connections...
  • Page 12: Condensation Water Drain

    NOTE During operation, negative pressure arises in the ventilation heat exchanger, which means that a water column of at least 100 mm must be guaranteed in the water seal. Chapter 4 | Pipe and ventilation connections NIBE GV-HR 130...
  • Page 13: General Ventilation Connections

    Ø125 Ø125 EXHAUST AIR DUCT /KITCHEN FAN Outdoor air Exhaust air duct (kitchen fan) must not be connected to Extract air GV-HR 130. NIBE GV-HR 130 Chapter 4 | Pipe and ventilation connections...
  • Page 14: Preheating The Outdoor Air

    EAH heats the incoming outdoor air so that the extract air temperature does not fall to the stated level. See the Installer Manual for EAH for more information. EB17 GV-HR 130 Chapter 4 | Pipe and ventilation connections NIBE GV-HR 130...
  • Page 15: Electrical Connection

    GV-HR 130 must not be powered during install- ation. NOTE If the supply cable is damaged, only NIBE, its service representative or similar authorised person may replace it to prevent any danger and damage.
  • Page 16: External Connection Options

    SD card After commissioning GV-HR 130, it is possible to have the installation in operation without an SD card (AA32), but there will then not be any help texts in the display. Chapter 5 | Electrical connection NIBE GV-HR 130...
  • Page 17: Commissioning And Adjusting Preparations

    The ventilation has to be set according to applicable (l/s) standards. The supply air flow is adjusted to guarantee a negative pressure. The settings are adjusted in Service menu, menu 10-15. NIBE GV-HR 130 Chapter 6 | Commissioning and adjusting...
  • Page 18 End point for factory set values Fan output GV-HR 130-250 Relative humidity Effekt Output 100% Outdoor temperature Utetemperatur Airflow Flöde (ºC) (l/s) For more information, see page The diagram shows the power consumption per fan. Chapter 6 | Commissioning and adjusting NIBE GV-HR 130...
  • Page 19: Control - Introduction

    Here you start or switch off any re-heater (external by pressing and holding the button for 3-4 seconds. component that is not supplied by NIBE). It is a precondition that Service menu, menu 28 - If the symbol is set to +, the heater will be connec- "Stop the unit", is set to "on".
  • Page 20: Main Menu

    TEMPERATURE Calendar User menu Display Here you set the temperature for any re-heater Operation info (external component that is not supplied by NIBE). Service menu Down arrow Enter Up arrow Here you can find the ventilation heat exchanger’s menu system.
  • Page 21: Menu System

    " to increase or decrease the value. Temperature Preheat Reheat Level 3-4 hrs User menu Filter change SET 22.9 °C 3mon Humid.contr. Temperature Preheat Reheat Level 3-4 hrs Filter change 3mon Humid.contr. NIBE GV-HR 130 Chapter 7 | Control - Introduction...
  • Page 22 In many menus there is a symbol that indicates that extra help is available. To access the help text, press the Help button. To exit help mode, press the Exit button or " ". Chapter 7 | Control - Introduction NIBE GV-HR 130...
  • Page 23: Control - Menus

    2 - Preheating 3 - Reheating 4 - Level 3-4 hours 5 - Filter replacement 6 - Humidity control 1 Accessory needed. 2 External component that is not supplied by NIBE. NIBE GV-HR 130 Chapter 8 | Control - Menus...
  • Page 24: Display

    16 - Display 17 - Service menu 18 - Password Operation info OVERVIEW Operation info 1 - Temperatures 2 - Fans 3 - Functions 4 - Alarm 5 - Hour counter Chapter 8 | Control - Menus NIBE GV-HR 130...
  • Page 25: Service Menu

    42 - Re-heater PI I 43 - Reheating control 44 - Demand control 45 - Fire damper External component that is not supplied by NIBE. MENU 10 - LEVEL 1 SUPPLY AIR Sub-menus Setting range: 0 - 100% Service menu is intended for advanced users.
  • Page 26 Select the return time for temporary speed change (speed 3) of the ventilation in User menu, menu 4 - "Level 3-4 hours". Return time is the time taken before the ventilation speed returns to level 2. Chapter 8 | Control - Menus NIBE GV-HR 130...
  • Page 27 This function is only active if the set ing. This function is used if the installation has an electrical value is greater than 0°C. air heater (EAH) installed. NOTE Can cause negative pressure in the house. NIBE GV-HR 130 Chapter 8 | Control - Menus...
  • Page 28 The electrical air heater (EAH) is controlled with PI con- trol. MENU 31 - MODBUS ADDRESS In this menu, you set the desired amplification (the P section). Setting range: 1 - 247 Default value: 1 Set the address here. Chapter 8 | Control - Menus NIBE GV-HR 130...
  • Page 29 For electrical re-heaters that can be controlled with PI control. In this menu, you set the desired amplification (the P section). MENU 42 - RE-HEATER PI I Setting range: 1 - 255 Default value: 200 NIBE GV-HR 130 Chapter 8 | Control - Menus...
  • Page 30: Disturbances In Comfort

    ALARM If there is an alarm, a malfunction has occurred that GV- HR 130 cannot rectify itself. The display shows what type of alarm it is. Chapter 9 | Disturbances in comfort NIBE GV-HR 130...
  • Page 31: Troubleshooting

    – Check the setting for "Speed" in the Operating menu. – Check the setting for "Extended operation" in the Operating menu. – Check User menu, menu 4 - "Level 3-4 hour" and select "off" to return automatically to level 2. NIBE GV-HR 130 Chapter 9 | Disturbances in comfort...
  • Page 32: Service

    Logging If you want to see the installation’s operating licence, connect the display to a computer. You will need a data logging program in order to analyse the information. Chapter 10 | Service NIBE GV-HR 130...
  • Page 33: Accessories

    ELECTRICAL AIR HEATER EAH 21 In cold weather, EAH 21-900 heats the incoming outdoor air slightly to prevent the condensation in GV-HR 130 from freezing. Used mainly in colder climates. Part no. 067 606 NIBE GV-HR 130 Chapter 11 | Accessories...
  • Page 34: Technical Data

    12 Technical data Dimensions 1271 (1367 incl. roof mounting) 1271 (1367 inkl takfäste) 1202 Ø15 Ø125 Ø125 Chapter 12 | Technical data NIBE GV-HR 130...
  • Page 35: Technical Specifications

    (°C) (°C) (l/s) (l/s) Airflow Airflow Luftflöde Luftflöde Outdoor air: 5 °C Exhaust air 25 °C RH exhaust air: <27.7 Outdoor air: 5 °C Exhaust air 25 °C RH exhaust air: <27.7 NIBE GV-HR 130 Chapter 12 | Technical data...
  • Page 36: Energy Labelling

    General ventilation connections on page 13. Information about pre-/disassembly See section Recovery on page 5. This installer manual can also be accessed at nibe.eu. The annual electricity consumption kWh/year Annual heating saved, kWh primary energy per year Average: 4,548 Average: 4,413...
  • Page 37: Electrical Circuit Diagram

    Electrical circuit diagram NIBE GV-HR 130 Chapter 12 | Technical data...
  • Page 39: Contact Information

    Tel: +46 (0)433-27 3000 kuzmin@evan.ru info@nibe.se nibe-evan.ru nibe.se SWITZERLAND NIBE Wärmetechnik c/o ait Schweiz Industriepark, CH-6246 Altishofen Tel. +41 (0)58 252 21 00 info@nibe.ch nibe.ch For countries not mentioned in this list, contact NIBE Sweden or check nibe.eu for more information.
  • Page 40 WS version: a553 (working edition) Publish date: 2018-07-12 07:02 This manual is a publication from NIBE Energy Systems. All product illustrations, facts and data are based on the available information at the time of the publication’s approval. NIBE Energy Systems makes reservations for any factual or printing errors in this manual.

This manual is also suitable for:

Gv-hr 130-150Gv-hr 130-250

Table of Contents