Dimension and ventilation connections Energy labelling Preheating the outdoor air Electrical circuit diagram 5 Electrical connection Contact information Display External connection options SD card 6 Commissioning and adjusting Preparations Filling and venting Start-up and inspection NIBE GV-HR 130 Table of Contents...
This symbol indicates danger to person or ma- chine . Caution This symbol indicates important information about what you should consider when installing or servicing the installation. This symbol indicates tips on how to facilitate using the product. Chapter 1 | Important information NIBE GV-HR 130...
No special tools are required for access. Improper disposal of the product by the user results in administrative penalties in accordance with current le- gislation. NIBE GV-HR 130 Chapter 1 | Important information...
Leave a free space of 1,000 mm in front of the distribu- tion box and 200 mm in front of the other sides. Because servicing is carried out from underneath, free space of 1,600 mm is recommended below the unit. NIBE GV-HR 130 Chapter 2 | Delivery and handling...
Slacken off the four screws holding the side panel. Move the panel out and downwards. L E K Unscrew all the screws holding the bottom panel. L E K Lift the bottom panel down. L E K Chapter 2 | Delivery and handling NIBE GV-HR 130...
Humidity sensor, exhaust air (P1) QN37 Bypass damper Miscellaneous Type plate Designations in component locations according to standard IEC 81346-2. Designations in brackets show the name of the component in the display. Chapter 3 | The ventilation heat exchanger design NIBE GV-HR 130...
When installing on a wooden roof, a vibration damper is recommended to prevent vibration being transferred. 1202 Ø15 Install the two enclosed roof mountings in the roof. 1205 Move GV-HR 130 into position. Secure GV-HR 130 with screws. NIBE GV-HR 130 Chapter 4 | Pipe and ventilation connections...
NOTE During operation, negative pressure arises in the ventilation heat exchanger, which means that a water column of at least 100 mm must be guaranteed in the water seal. Chapter 4 | Pipe and ventilation connections NIBE GV-HR 130...
Ø125 Ø125 EXHAUST AIR DUCT /KITCHEN FAN Outdoor air Exhaust air duct (kitchen fan) must not be connected to Extract air GV-HR 130. NIBE GV-HR 130 Chapter 4 | Pipe and ventilation connections...
EAH heats the incoming outdoor air so that the extract air temperature does not fall to the stated level. See the Installer Manual for EAH for more information. EB17 GV-HR 130 Chapter 4 | Pipe and ventilation connections NIBE GV-HR 130...
GV-HR 130 must not be powered during install- ation. NOTE If the supply cable is damaged, only NIBE, its service representative or similar authorised person may replace it to prevent any danger and damage.
SD card After commissioning GV-HR 130, it is possible to have the installation in operation without an SD card (AA32), but there will then not be any help texts in the display. Chapter 5 | Electrical connection NIBE GV-HR 130...
The ventilation has to be set according to applicable (l/s) standards. The supply air flow is adjusted to guarantee a negative pressure. The settings are adjusted in Service menu, menu 10-15. NIBE GV-HR 130 Chapter 6 | Commissioning and adjusting...
Page 18
End point for factory set values Fan output GV-HR 130-250 Relative humidity Effekt Output 100% Outdoor temperature Utetemperatur Airflow Flöde (ºC) (l/s) For more information, see page The diagram shows the power consumption per fan. Chapter 6 | Commissioning and adjusting NIBE GV-HR 130...
Here you start or switch off any re-heater (external by pressing and holding the button for 3-4 seconds. component that is not supplied by NIBE). It is a precondition that Service menu, menu 28 - If the symbol is set to +, the heater will be connec- "Stop the unit", is set to "on".
TEMPERATURE Calendar User menu Display Here you set the temperature for any re-heater Operation info (external component that is not supplied by NIBE). Service menu Down arrow Enter Up arrow Here you can find the ventilation heat exchanger’s menu system.
" to increase or decrease the value. Temperature Preheat Reheat Level 3-4 hrs User menu Filter change SET 22.9 °C 3mon Humid.contr. Temperature Preheat Reheat Level 3-4 hrs Filter change 3mon Humid.contr. NIBE GV-HR 130 Chapter 7 | Control - Introduction...
Page 22
In many menus there is a symbol that indicates that extra help is available. To access the help text, press the Help button. To exit help mode, press the Exit button or " ". Chapter 7 | Control - Introduction NIBE GV-HR 130...
42 - Re-heater PI I 43 - Reheating control 44 - Demand control 45 - Fire damper External component that is not supplied by NIBE. MENU 10 - LEVEL 1 SUPPLY AIR Sub-menus Setting range: 0 - 100% Service menu is intended for advanced users.
Page 26
Select the return time for temporary speed change (speed 3) of the ventilation in User menu, menu 4 - "Level 3-4 hours". Return time is the time taken before the ventilation speed returns to level 2. Chapter 8 | Control - Menus NIBE GV-HR 130...
Page 27
This function is only active if the set ing. This function is used if the installation has an electrical value is greater than 0°C. air heater (EAH) installed. NOTE Can cause negative pressure in the house. NIBE GV-HR 130 Chapter 8 | Control - Menus...
Page 28
The electrical air heater (EAH) is controlled with PI con- trol. MENU 31 - MODBUS ADDRESS In this menu, you set the desired amplification (the P section). Setting range: 1 - 247 Default value: 1 Set the address here. Chapter 8 | Control - Menus NIBE GV-HR 130...
Page 29
For electrical re-heaters that can be controlled with PI control. In this menu, you set the desired amplification (the P section). MENU 42 - RE-HEATER PI I Setting range: 1 - 255 Default value: 200 NIBE GV-HR 130 Chapter 8 | Control - Menus...
ALARM If there is an alarm, a malfunction has occurred that GV- HR 130 cannot rectify itself. The display shows what type of alarm it is. Chapter 9 | Disturbances in comfort NIBE GV-HR 130...
– Check the setting for "Speed" in the Operating menu. – Check the setting for "Extended operation" in the Operating menu. – Check User menu, menu 4 - "Level 3-4 hour" and select "off" to return automatically to level 2. NIBE GV-HR 130 Chapter 9 | Disturbances in comfort...
Logging If you want to see the installation’s operating licence, connect the display to a computer. You will need a data logging program in order to analyse the information. Chapter 10 | Service NIBE GV-HR 130...
ELECTRICAL AIR HEATER EAH 21 In cold weather, EAH 21-900 heats the incoming outdoor air slightly to prevent the condensation in GV-HR 130 from freezing. Used mainly in colder climates. Part no. 067 606 NIBE GV-HR 130 Chapter 11 | Accessories...
General ventilation connections on page 13. Information about pre-/disassembly See section Recovery on page 5. This installer manual can also be accessed at nibe.eu. The annual electricity consumption kWh/year Annual heating saved, kWh primary energy per year Average: 4,548 Average: 4,413...
Tel: +46 (0)433-27 3000 kuzmin@evan.ru info@nibe.se nibe-evan.ru nibe.se SWITZERLAND NIBE Wärmetechnik c/o ait Schweiz Industriepark, CH-6246 Altishofen Tel. +41 (0)58 252 21 00 info@nibe.ch nibe.ch For countries not mentioned in this list, contact NIBE Sweden or check nibe.eu for more information.
Page 40
WS version: a553 (working edition) Publish date: 2018-07-12 07:02 This manual is a publication from NIBE Energy Systems. All product illustrations, facts and data are based on the available information at the time of the publication’s approval. NIBE Energy Systems makes reservations for any factual or printing errors in this manual.