6 Commissioning and adjusting
Preparations
• In the event an electrical air heater (EAH) is installed,
the temperature limiter (EB17-FQ10) in this heater
must be checked. It may have tripped during transport.
• Check that the air filters are clean, they can become
dirty after installation.

Filling and venting

• Check that there is water in the water seal, fill if ne-
cessary.
Start-up and
inspection
COMMISSIONING
The first time the installation is started, a start guide is
launched. In the start guide, you select the language
you want in the display.
Caution
As long as the start guide is active, no function
in GV-HR 130 will start automatically.
OPERATION IN THE START GUIDE
1.
Press the Next button to scroll between the select-
able languages.
2.
Select language by pressing "
After the language has been chosen, GV-HR 130 will
enter the appropriate program version in the selected
language, which takes approx. 1.5 minutes.
SETTING THE VENTILATION
The ventilation has to be set according to applicable
standards. The supply air flow is adjusted to guarantee
a negative pressure. The settings are adjusted in Service
menu, menu 10-15.
NIBE GV-HR 130
Even if ventilation is roughly set at installation it is im-
portant that a ventilation adjustment is ordered and
permitted.
Ventilation capacity GV-HR 130-150
Ventilation capacity GV-HR 130-250
".
Caution
An incorrectly set ventilation flow can damage
the house and may also increase energy con-
sumption.
NOTE
Order a ventilation adjustment to complete the
setting.
Available pressure
Tryck
(Pa)
400
100%
350
300
90%
250
80%
200
70%
150
60%
100
50%
40%
50
0
0
10
20
30
Tillgängligt tryck
Available pressure
(Pa)
400
350
300
250
200
150
100
50
40%
30%
0
0
10
20
30
40
Chapter 6 | Commissioning and adjusting
40
50
60
Airflow
Flöde
(l/s)
100%
80%
70%
60%
50%
50
60
70
80
Airflow
Flöde
(l/s)
17