Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person. In addition, fill in the page for the installation data in the User Manual.
Description
✔
Ventilation (page 13)
Setting ventilation flow exhaust air level
1
Setting ventilation flow exhaust air level
2
Setting ventilation flow exhaust air level
3
Setting ventilation flow supply air level 1
Setting ventilation flow supply air level 2
Setting ventilation flow supply air level 3
Electricity (page 15)
Connections
Main voltage
Fuses property
Earth circuit-breaker
6
Chapter 1 | Important information
Notes
Signature
Date