Completing Commissioning - Miele PDR 908 EL Marine Operating And Installation Instructions

Vented dryer
Hide thumbs Also See for PDR 908 EL Marine:
Table of Contents

Advertisement

Initial commissioning

Completing commissioning

The commissioning procedure is com-
pleted when a programme lasting
longer than 20 minutes has been car-
ried out in full.
If the power is interrupted prior to the
start of the first drying programme
(e.g. if the machine is switched off
with the  button), the initial commis-
sioning process can be completed
again. Once a drying programme has
been running for over 20 minutes, the
initial commissioning process does
not have to be performed again.
 Confirm with
OK
 In the main menu, touch the  
grammes
 sensor.
Programmes
Automatic
Timed drying
plus
Timed drying
Microfibre
 Select the Timed drying cool air pro-
gramme.
 Touch the Duration sensor.
Duration
02
01
00
02
01
26
.
Basket
warm air
programme
Basket - Low
cool air
temperature
22
21
20
h
59
58
Reset
 Place your finger on the number that
you want to change and move your
finger in the direction you want.
 Select a duration of 20 minutes.
 Confirm with
 Touch the flashing Start/Stop sensor.
After this programme has finished, the
tumble dryer is ready for use.
Pro-
11:02
11:02
OK
OK
.

Advertisement

Table of Contents
loading

Table of Contents