Site Preparation - Follett Horizon Chewblet series Installation Instructions Manual

For drop-ins
Hide thumbs Also See for Horizon Chewblet series:
Table of Contents

Advertisement

Prepare the installation site.
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation of
low side is not recommended and will void warranty.
2.1
2.1
Installation site requirements
Electrical
• 120/60/1-6 amps
Potable water supply
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Follett recommends the use of an in-line water fi ltration system (item# 00130286)
Drain
• The drain line from the ice machine must have at least 1/4" per foot pitch (6,4mm/0,3m)
Refrigeration lines
• 1000, 1400: 5/8" (15,8mm) diameter suction (insulated)
• 1650: 7/8" (22,2mm) diameter suction (insulated)
• 3/8" (9,5mm) liquid
DROP-IN • RIDE Technology
remote condensing

Site preparation

208264
Stock Module Identification Plate
Module No.
Product
Service No.
1/4"
2
3/8" ∅ (9,5mm)
NEMA
5-15
5

Advertisement

Table of Contents
loading

Table of Contents