Start Up; Normal Operating Procedure - Schenker SMART 80 Installation, Use And Maintenance Manual

Digital 12/24 v dc
Table of Contents

Advertisement

5 – FUNTIONING AND USE

5.3.2 Start up

1. Open the depressurization valve (lever horizontal)
2. Push for 20-30 sec the red button on the active
carbon filter housing cup in order to purger the air
from the system.
3. Activate the start up procedure throw the function
of the MENU (select the specific function in the menu
mode, exit from menu mode pushing STOP, and start
the procedure pushing START).
4. Close the depressurization valve when the display
shows the specific message and wait for
completion of the procedure.
The procedure lasts about 3 minutes, and it can anyway be stopped anytime pushing STOP. After completed
the procedure the system is ready to start normally.

5.4 Normal operating procedure

Please, be sure to perform all the following checks before proceeding normal operating procedure:
1. Be sure the reset valve is closed (lever orthogonal to the body valve) and the positioner completely
unscrewed.
2. Be sure the depressurization valve is closed.
THE PRESENT MANUAL BELONGS TO -
the
Schenker Italia
- ALL RIGHTS RESERVED
36
COD.
80S12/24.D.2018
EN

Advertisement

Table of Contents
loading

Table of Contents