Dura Trel Oxford Trellis 11175 Assembly Instructions

Advertisement

max 5 x 3.5

General Information

PLEASE READ THROUGH BEFORE BEGINNING ASSEMBLY.
IMPORTANT: Check boxes for Contents Listed
Check inside of parts as some parts are packaged
inside of others
In the event of missing, damaged or defective parts
please call our customer service dept. at 1-877-258-6020
When assembling components, place on a clean, flat
non-abrasive surface to avoid scratches

Tools Required

... Battery or Electric Drill
... Tape Measure
... Hammer or Rubber Mallet
... PVC, Super, or Crazy Glue
with #2 phillips bit
(recommended)
Oxford Trellis
11175
Model#
Part #
1
2" sq. x 65" Corner Post
2
2" sq. x 59½" Left Post
3
2" sq. x 59½" Right Post
4
⅞ x 1½ x 20" Top/Bottom Cross Rail
5
⅞ x 1½ x 19" Bent Top
6
¼ x 1½ x 49" Vertical Slat
7
¼ x 1½ x 19¼" Horizontal Slat
8
2" sq. x 14" Vinyl Ground Anchor
9
Hardware Bag
2" sq. Post Cap
¾" Painted Screw
150 Birch Road
P.O. Box 122
Sheboygan Falls, WI 53085
Assembly Instructions
Description
(includes:)
1-877-258-6020
www.dura-trel.com
sales@dura-trel.com
Qty
1
1
1
4
2
4
12
3
1
3
8
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Oxford Trellis 11175 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Dura Trel Oxford Trellis 11175

  • Page 1 Oxford Trellis 11175 Model# Assembly Instructions Part # Description 2" sq. x 65" Corner Post max 5 x 3.5 2" sq. x 59½" Left Post 2" sq. x 59½" Right Post ⅞ x 1½ x 20" Top/Bottom Cross Rail ⅞ x 1½ x 19" Bent Top ¼...
  • Page 2 Warranty Statement 20 Year Guarantee Please call manufacturer direct with questions concerning missing or defective parts at Toll Free: 877-258-6020. Dura-trel, Inc. products are warranted to be free from manufacturing defects resulting in delaminating, peeling, flaking, corroding, cracking, crazing, or extreme amounts of fading or bleaching causing the PVC to change to its natural color for a period of 20 years from the date of purchase.
  • Page 3 Starting at the bottom of 59½" left post (part 2) insert one 20" top/bottom cross rail (part 4) and six 19¼" horizontal slats (part 7). Starting at top, weave one 49" vertical slat (part 6) above and below horizontal slats, inserting end into bottom cross rail. Weave a second 49" vertical slat (part 6) above and below horizontal slat opposite previous slat, inserting end into bottom cross rail.
  • Page 4 Insert left and right trellis panels (from Page 3) into 65" corner post (part 1). In order for trellis to look symmetrical, top/bottom cross rails, horizontal slats and bent tops must be fully inserted into 59½" left and right posts. Using two ¾" screws per outer post and four ¾" screws for corner post, fasten together trellis. Using PVC, super or crazy glue, apply glue to inner corners of each 2"...
  • Page 5 Oxford Trellis 11175 2" sq. x 65" OXT Corner Post 1.00 2" sq. x 59½ OXT Left Post 1.00 2" sq. x 59½ OXT Right Post 1.00 ⅞ x 1½ x 20" OXT Top/Bottom 4.00 ⅞ x 1½ x 19" OXT Bent Top 2.00 ¼...

Table of Contents