Summary of Contents for Venmar ISPIRA IS700 Series
Page 1
READ AND SAVE THESE INSTRUCTIONS INSTALLER: LEAVE THIS MANUAL WITH HOMEOWNER. HOMEOWNER: USE AND CARE INFORMATION ON PAGES 15 Venmar Ventilation ULC, 550 Lemire Blvd., Drummondville QC J2C 7W9 1-800-567-3855 REGISTER YOUR PRODUCT ONLINE AT: www.bnv.ca For additional information, visit www.venmar.ca...
Page 2
Always turn hood ON when cooking at high 9. To reduce the risk of fire and electrical shock, heat or when flambeing food (i.e.: Crêpes the Venmar Ispira IS700 series models Suzette, Cherries Jubilee, Peppercorn Beef should only be installed with their own built-in Flambé).
WARNING This hood is equipped with a RF receiver (optional remote control sold separately). Changes or modifications not expressly approved by the party responsible for compliance could void the user’s authority to operate this product. The remote control has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules and the Canadian ICES-003.
INSTALL DUCTWORK Plan where and how the ductwork will be installed. A straight, short duct run will allow the hood to perform most efficiently. 8” Install proper-sized ductwork, elbows and roof cap. OUND Connect metal ductwork to cap and work back towards the hood location.
2. PREPARE INSTALLATION WARNING When performing installation, servicing or cleaning the unit, it is recommended to wear safety glasses and gloves. NOTE: Before proceeding to the installation, check the contents of the box. If items are missing or damaged, contact the manufacturer. Make sure that the following items are included: - Hood - Accessories...
4. INSTALL MOUNTING BRACKET WARNING When building framework, always follow all applicable construction codes and standards. 10¼" 1. Modify ceiling stucture over hood location. Install 2" x 4" cross framing ⁄ " 10 ⁄ " 10¼" between ceiling joists using ceiling mounting bracket dimensions shown at right.
4. INSTALL MOUNTING BRACKET (CONT'D) 8” ROUND DUCTWORK 3. Remove both screws retaining the ceiling RONT OF HOOD mounting bracket to the top of the hood. Discard screws. Position the mounting plate in such a way that one of the sides without a “T”...
5. ASSEMBLE ANGLE BRACKETS (CONT'D) 2. Determine angle brackets length based upon ceiling height and desired height of hood above cooktop. If required, assemble a second set of 4 angle brackets to the upper angle bracket set according to the length needed. Use 16 no. 10-32 x 1/2" quadrex screws and 16 no.
INSTALL GLASS PANELS (WG MODEL ONLY) The WG hood model decorative glass panels are sold separately and have to be installed before completing the hood installation. 1. Carefully remove glass panel from its packaging. Remove glass panel nuts (factory installed) from both studs and set aside.
8. PREPARE HOOD (ALL MODELS) 1. From inside the hood, disconnect the blower. HE0063 LECTRICAL COMPARTMENT RETAINING SCREW 2.Remove the electrical box cover retaining screw. Set cover and screw aside. HE0062 3. Turn the hood over and remove blower box 8 retaining screws (only 4 out of 8 screws illustrated at right).
Page 11
8. PREPARE HOOD (ALL MODELS) (CONT'D) 5. Attach the adapter/damper to the blower box using 4 no. 8 x 3/8" quadrex screws (included). Remove tape on damper. HJ0066 6. Measure the required length of 8" round metal duct from the adapter/damper to the ductwork rough-in in the ceiling.
9. INSTALL HOOD WARNING BE CAREFUL when installing the decorative flue and hood, they may have sharp edges. CAUTION DO NOT REMOVE the protective plastic film covering the decorative flue (upper and lower) and the hood yet. 1. Attach blower box assembly to lower angle brackets using 16 no.
Page 13
9. INSTALL HOOD (CONT'D) 4. Attach the hood to the blower box using the 8 screws previously removed at step 8.2 (only 4 out of 8 screws are illustrated at right). Make sure that the house wiring goes into the electrical compartment. HD0426 CREW LOCATIONS CREW LOCATIONS...
10. CONNECT WIRING WARNING Risk of electric shock. Electrical wiring must be done by qualified personnel in accordance with all applicable codes and standards. Before connecting wires, switch power off at service panel and lock service disconnecting means to prevent power to be switched on accidentally.
12. LED LIGHTING The lighting of this hood is produced by two LED modules (included). WARNING Do not touch lamps during or soon after operation. Burns may occur. Cannot be replaced by any other type of light bulb or LED module. 13.
14. OPERATION Always turn your hood on before you begin cooking to establish an air flow in the kitchen. Let the blower run for a few minutes to clear the air after you turn off the range. CAUTION After a power failure or during the range hood power up, a 5-second booting sequence is executed.
Page 17
14. OPERATION ( CONT ™: The hood is equipped with a HEAT SENTRY thermostat. If blower is ON at a lower ENTRY speed setting and excessive heat is detected above the cooking surface, it turns the blower up to third speed. When the temperature level drops to normal, the blower will return to its original setting.
ARTS AND EPAIRS In order to ensure your unit remains in good working condition, you must use Venmar Ventilation ULC genuine replacement parts only. Venmar Ventilation ULC genuine replacement parts are specially designed for each unit and are manufactured to comply with all the applicable certification standards and maintain a high standard of safety.
To contact Venmar Ventilation ULC warranty service, call 1-800-567-3855 in Canada. In order to qualify for a warranty claim, the owner of a Venmar Ispira IS700 Series range hood must have the model and serial number along with a proof of the original purchase date. At the time of requesting service, describe the nature of any defect in the product or part.
Need help?
Do you have a question about the ISPIRA IS700 Series and is the answer not in the manual?
Questions and answers