Before you install the downdraft station, you need to plan the site for
installation. Examine the location where you intend to install the station.
You must be certain that the area is level and of solid construction. In
addition, a source of electrical power must be located near the installation
site.
Carefully read this chapter to learn:
Space requirements.
Location requirements.
Electrical power requirements.
Exhaust requirements.
Refer to Appendix C: Specifications, for complete station electrical and
environmental conditions, specifications and requirements.
Space Requirements
The dimensions for the downdraft station are shown in Appendix B:
Dimensions.
Clearance
A minimum clearance of at least 6 inches (150 mm) is suggested on the
top of the station to allow for the unobstructed discharge of filtered air.
Location Requirements
Note: The station should be located on a flat, level bench or work surface
for proper operation.
2
:
:
i
t
e
s
i
t
e
s
Product Service 1-800-522-7658
Need help?
Do you have a question about the Protector 3410000 and is the answer not in the manual?
Questions and answers