7.3.6 To install the discharge grille

EPRA08~12EAV3+W1 + ETVZ12S18+23EA6V+9W
Daikin Altherma 3 H MT F
4P634887-1 – 2021.03
NOTICE
Provide at least 150  mm of free space below the unit. Additionally, make sure the
unit is positioned at least 100 mm above the expected level of snow.
Use the drain plug (with O-ring) and a hose for drainage.
1
c
3
c
a Drain hole
b O-ring (delivered as accessory)
c Drain plug (delivered as accessory)
d Hose (field supply)
NOTICE
O-ring. Make sure the O-ring is installed correctly to prevent leakage.
INFORMATION
Electrical wiring. Before installing the discharge grille, connect the electrical wiring.
Install the lower part of the discharge grille
1 Insert the hooks.
2 Insert the ball studs.
2
a
b
d
7
Unit installation
|
Installer reference guide
61