To Connect The Shut-Off Valve - Daikin Altherma 3 H MT F Installer's Reference Manual

Hide thumbs Also See for Altherma 3 H MT F:
Table of Contents

Advertisement

9
|
Electrical installation

9.3.3 To connect the shut-off valve

Installer reference guide
102
NOTICE
Do NOT cut or remove the backup heater power supply cable.
INFORMATION
Shut-off valve usage example. In case of one LWT zone, and a combination of
underfloor heating and heat pump convectors, install a shut-off valve before the
underfloor heating to prevent condensation on the floor during cooling operation.
For more information, see the installer reference guide.
Wires: 2×0.75 mm²
Maximum running current: 100 mA
230 V AC supplied by PCB
[2.D] Shut off valve
1 Open the following (see
1 Top panel
2 User interface panel
3 Upper switch box cover
2 Connect the valve control cable to the appropriate terminals as shown in the
illustration below.
NOTICE
Wiring is different for a NC (normally closed) valve and a NO (normally open) valve.
A
"7.2.5 To open the indoor
M2S
4
unit" [
 54]):
1
EPRA08~12EAV3+W1 + ETVZ12S18+23EA6V+9W
Daikin Altherma 3 H MT F
4P634887-1 – 2021.03
3
2

Advertisement

Table of Contents
loading

Table of Contents