Figure 5-111 Installed OT terminal
Install two OT terminals on a post.
Before you install two OT terminals on a post, ensure that the two terminals can be
installed on the post and that the electrical connecting pieces have a large contact area.
Two OT terminals can be installed using any of these methods:
– Bend the upper OT terminal at a 45- or 90-degree angle, as shown in
– Cross the two terminals, as shown in
Figure 5-112 Bending the upper OT terminal at a 45- or 90-degree angle
Figure 5-113 Crossing two terminals