Operation - Conti COMPACT Technical Documentation Manual

Table of Contents

Advertisement

5. OPERATION

5.1. RECOMMANDATIONS
➢ Open the general water tap, if it is closed, then open the water shutoff valve dedicated to the
machine.
➢ Do not put the supplying voltage at this moment.
➢ Verify the presence of water, by reading the pressure of the mains water inlet on the M2
manometer pump.
5.2. INITIAL FILLING
➢ Ensure that steam taps operating levers 'V' are open (up).
➢ Put the ON/OFF switch 'C' to position 1 (power on).
➢ The key board turn on.
➢ The boiler fills automatically, without heating.
➢ The machine start to heat automatically, only when the level probe is reached by the water
➢ A scrolling LED on keypads can inform the user about the status.
➢ Close the steam tap "V" and wait.
➢ When the scrolling leds stops : The machine is ready to operate
5.3. FURTHER FILLINGS
Further fillings will run automatically, according to the hot water needs.
The water level in the boiler is controlled by the electronics, by the means of a level probe.
SACOME, CONFIDENTIAL Document, it is forbidden to duplicate or communicate this document without previous authorization.
Edition 05/2021 - COMPACT - technical documentation - page 6

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the COMPACT and is the answer not in the manual?

Questions and answers

Table of Contents