Cabling; Leds; Table 2. Leds At The Left On The Front Panel; Table 3. Leds At The Right Of Every Port - Enterasys SSIM-H2-02 Installation And User Manual

Enterasys smartstack ssim-h2-02 interface module: user guide
Table of Contents

Advertisement

10

Cabling

The module uses standard or crossed-over UTP-5 copper cables. The maximum
cable length is 100 m (328 feet).
1. Insert the modular RJ-45 jack from either end of a standard or crossed-over
UTP-5 cable into one of the connectors on the SSIM-H2-02 front panel.
2. Connect the other end of the cable to:
— another TS port (using the crossed-over UTP-5 cable)
— 100/10 MB Ethernet adapter (using the crossed-over UTP-5 cable)
— 100/10 MB Ethernet switch or hub port (using the standard UTP-5 cable)

LEDs

There are eight LEDs on the front panel of the SSIM-H2-02. During normal
operation, the two LEDs on the left side of the front panel indicate the module
status:
LED
DIAG (green)
ERR (yellow)

Table 2. LEDs at the Left on the Front Panel

The three LEDs on the right of every port indicate the port status:
LED
ACTIVITY
(green)

Table 3. LEDs at the Right of Every Port

SSIM-H2-02 Fast Ethernet - Translational Switch SmartStack Interface Module Installation and User Guide
Position
State
Top
On
Off
Bottom
On
Off
Position
State
Top
Flashing
Off
Meaning
Diagnostics are in process.
No diagnostics are in process.
A module failure has occurred.
The module is working
correctly.
Meaning
The port is receiving or
transmitting frames.
Currently no traffic on the port.
Installation

Advertisement

Table of Contents
loading

Table of Contents