Raven CR7 Quick Start Manual page 8

Hide thumbs Also See for CR7:
Table of Contents

Advertisement

Note:
Currently the "spreader" is mounted with a
working width of 16 meters devided in one
section. Working width is the distance that
12
will be created between the various
guidance lines. Press the green checkmark
finish the configuration.
An overview of the current selected tractor
and implement is provided.
13
Press the green check mark to confirm.
The machine has been configured, press the
14
green check mark again to return to the
main screen.
New lines (AB Lines):
Chapter 4
Loading field:
15
Chapter 6
New Field (create bounderies):
Chapter 10
PAGE 8/35 | User manual | 116-8000-017 | Rev. B2
SELECT IMPLEMENT | CR7/CR12 | QUICK START GUIDE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr12

Table of Contents