Unit Installation; Flow Chart; Precautions For Engineering Work - Gree FP-22LM/D-K Service Manual

Exposed fan coil unit
Hide thumbs Also See for FP-22LM/D-K:
Table of Contents

Advertisement

UNIT INSTALLATION

1 Flow chart

Installation preparation
Installation of
water valve

2 Precautions for engineering work

(1) The unit should be installed in accordance with instructions covered in the user's manual and make
sure enough maintenance space is reserved around the unit. The air inlet and outlet should be
far away from obstacles, so that air flow can go through everywhere of the room. When the heat
exchanging room is too small, it would lead to decreased capacity.
(2) The unit should be installed where no smog, corrosive and inflammable gases are present,
otherwise the unit would fail to run normally or its service life would be shortened.
(3) Fit valves to entering and leaving water pipes and wrap units with a dust-proof cover.
Unit Installation
Installation of support
Installation of
drain pipes
24
Installation of units
Installation of
water pipes

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents