Installation Of Water Pipes - Gree FP-22LM/D-K Service Manual

Exposed fan coil unit
Hide thumbs Also See for FP-22LM/D-K:
Table of Contents

Advertisement

4.4.3 Installation of water pipes

(1) Open the panel. Loosen three screws and lift the decorated panels (on left or right side) 1cm above
and remove them in a horizontal way.
(2) Install water valves and pipes and get wires in.
(3) Metallic hoses similar to the picture below are recommended for inlet and outlet pipes.
(4) Pipe connectors and electric valve threads should be bounded with teflon tapes
(5) Fixing all water pipes tightly, start the water pump and check if there is leakage. Use the exhaust
valve to release all the gases inside pipes.
(6) Wrap with sponge the insulating sleeves that connect inlet and outlet pipes.
Wall
Nut
Bolt
Open the cover
Loosen screws
Remove it in
a horizontal way
Unit Installation
Outlet pipe
Inlet pipe
Drain pipe
31
Lift the decorated panels
(on left or right side) 1cm above
After
Before
Wire the electric box

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents