Initial Start-Up; Transportation; Unpacking The Eps 610; Moving The Eps 610 To The Installation Location - Bosch EPS 610 Original Instructions Manual

Injection pump test bench
Table of Contents

Advertisement

4.

Initial start-up

!
The EPS 610 is to be assembled, connected and com-
missioned only by a trained technician.
4.1

Transportation

!
After unpacking the EPS 610, it should not be left in
an unsheltered and dusty location.
i
The base of the EPS 610 is mounted and bolted to a
wooden pallet. It is also covered with polythene and
aluminium sheets for protection from rain and dirt.
For ease of unpacking, the top is bolted to the sides.
The following table describes the symbols on the wood-
en pallet.
Symbol
Description
Lashing points
Centre of gravity
Lift only from this side using long forklift.
Do not lift the crate from this side.
Risk of injury from improper handling
Improper handling of the EPS 610 during
unpacking could lead to injuries and damage
the EPS 610.
Wear safety shoes.
Always use suitable transport and lifting
equipment with an adequate load-bearing
capacity.
Observe the CG (refer to CG symbol on
the packaging).
Always secure the packaging case at the
specified lashing points when moving with
a crane or other lifting equipment.
Never stand beneath suspended loads.
!
Ensure that all parts are clamped before slinging.
!
The EPS 610 must be hoisted such that it does not
sway uncontrollably. Lift the bench slightly above
the ground to check if it tilts in one direction. If the
bench tilts, lower the bench and adjust the hoisting
cables.
Bosch Limited
Initial start-up | EPS 610 | 13
4.2

Unpacking the EPS 610

!
Do not use excessive force to open the packing.
1. Visually, check if there is any damage to the packing
case.
i
In case of damage, do not dispose of the damaged
items. They have to be preserved for inspection by
Bosch and the insurance company.
i
Observe the method of packaging on one side.
2. Dismantle the packaging case on any of the sides .
4.3
Moving the EPS 610 to the installa-
tion location
!
Avoid hard shocks and jolts.
i
In the case of a crane, the crane hook is positioned
directly above the Centre of Gravity (CG) symbol.
1. Lift the bench slightly to check the center of gravity.
If the bench tilts, lower the bench and adjust the
hoisting cables.
2. Hoist the bench.
i
If you are using a forklift, approach only from the
front or from rear side of the EPS 610. Use wooden
boards on the blades of the forklift to avoid damage
to the EPS 610. Ensure that the forks are equidistant
from the CG symbol. Place the forklift beneath the
EPS 610. Slightly lift to check if the bench is lifted
about its center of gravity.
i
The recommended diameter of the steel bars is 20
mm - 24 mm.
i
The following items should be removed only after the
bench is transported and positioned at the actual
location.
$
Wrapping used for protection from rain and dirt
$
Straps used for clamping, pipes, cables etc
3. Place the EPS 610 on a flat surface with the rubber
dampers as cushioning.
4. Remove all packaging material inside the machine
and the control cabinet.
i
When the EPS 610 is unpacked, ensure that you re-
tain the small boxes or packages containing parts.
en
|
F 002 DG9 918
2017-10-16