Protection or control unit, Intelligent electronic device (IED), configured and
with settings entered.
Configuration diagram for the IED
Terminal diagram for the IED, or plant circuit diagram including the IED
Technical reference manual for the IED
IED test set for secondary injection
Means to indicate, measure and record operation and times, e.g. an event
recording facility
A bi-stable relay (BR) or two auxiliary relays to simulate a CB
Two push-buttons (SC, ST) to operate the BR and a change-over switch (SRY)
to simulate CBREADY
Possibly a switch simulation the Synchrocheck (SYNC) condition
IED
SMBRREC - CLOSECB
Trip
SMBRREC - CBPOS
SMBRREC - CBREADY
EN09000206 V1 EN
Figure 14:
Simulating the CB operation by a bi-stable relay/breaker simulator
and manual switches

Preparation of the verification

Procedure:
1.
Check the function settings.
In the HMI tree they are found under:
Main menu/Settings/IED Settings/Control/SMBRREC(79,0->1)/
1:SMBRREC
If any timer settings are reduced to speed-up or facilitate the testing, they
shall be set to normal after testing. A temporary label on the unit can be a
reminder to restore normal settings after which a verification test should be
performed.
2.
Decide if a synchronization check (SYNC) shall be included in the test.
Testing functionality
BR
SC
ST
SRY
To test
set
+
-
IEC09000206_1_en.vsd