Getting Started-Installation, Start-Up, And Basic Configuration; Preparation; Safety; Installation Tools - ABB Pulsar Edge Product Manual

Table of Contents

Advertisement

Getting Started–Installation, Start-Up, and Basic Configuration

Preparation

This section outlines the sequence for installing and quickly configuring the Pulsar Edge controller into
a typical power system. A sample system will be illustrated here as an example but the individual
installation start-up guides must be consulted for specific shelves. Some power system shelf
configurations will be shipped from the factory with the controller pre-installed.

Safety

Read and follow all safety statements, warnings, and precautions in the Safety section of this manual
and manuals of all other equipment before installing, maintaining or repairing the equipment.

Installation Tools

You will need the following tools to install and test the Power System:
Wire cutters and strippers
Heat shrink gun
5/16-inch (8 mm) hex driver
1/4-inch hex driver
Digital meter with an accuracy of ±0.02%
Screw drivers (flat-blade and Phillips)
ESD wrist strap
Assortment of socket wrenches and drivers
Test cable

Packaging

All packages must be opened with a box cutter with the blade minimally exposed to cut only the sealing tape.
Save all packaging material until the system has been powered up and all parts are operating within specifications.
The shipping package may be used to return defective parts.

Install the Pulsar Edge Controller

The Pulsar Edge is easily slid in and out of a dedicated position in the shelf. Some shelf configurations
will have the controller factory preinstalled. This section primarily uses the Compact Power Line
controller as an example but the information provided is valid for other system configurations and
must be used with information in the Installation Start-Up documentation for each specific system.
Before applying power, a few basic controller configurations may be required. The following describes
steps for this initial configuration.
Page 19
© Copyright 2021 ABB. All rights reserved.
Protective canvas
Insulating rubber mat
Windows-based personal computer laptop (PC)
and cable to connect the PC communications port
to the local port of the controller or a CAT5 LAN
cable.

Advertisement

Table of Contents
loading

Table of Contents