ABB Relion 650 Series Commissioning Manual page 100

Hide thumbs Also See for Relion 650 Series:
Table of Contents

Advertisement

Section 6
Troubleshooting
92
In PCM600, only the result of these operations can be checked by right-
clicking the product and selecting Signal Monitoring tool and then
navigating to the actual I/O-board and the binary input in question. The
activated output signal is indicated with a yellow-lit diode. Each
BOn_PO is represented by two signals. The first signal in LHMI is the
actual value 1 or 0 of the output, and in PCM600 a lit or dimmed diode.
The second signal is the status Normal or Forced. Forced status is only
achieved when the BO is set to Forced or operated on the LHMI.
An initially high contact resistance will not cause problems as it will be reduced
quickly by the electrical cleaning effect of fritting and thermal destruction of
layers, bringing the contact resistance back to the mOhm range. As a result,
practically the full voltage is available at the load.
Set the parameter TestMode to Off after completing these
tests. The Start LED will stop flashing when the relay is
no longer in test mode.
1MRK 511 209-UEN -
REC650
Commissioning Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec650

Table of Contents