1MRK 511 209-UEN -
5.3.11.2
5.3.12
REC650
Commissioning Manual
Mode
Set value:
L1
L2
L3
2.
Adjust the injected current and voltage to the set values in % of IBase and
UBase (converted to secondary current and voltage). The angle between the
injected current and voltage shall be set equal to the set direction Angle1,
angle for step 1 (equal to 0° for low forward power protection and equal to
180° for reverse power protection). Check that the monitored active power is
equal to 100% of rated power and that the reactive power is equal to 0% of
rated power.
3.
Change the angle between the injected current and voltage to Angle1 + 90°.
Check that the monitored active power is equal to 0% of rated power and that
the reactive power is equal to 100% of rated power.
4.
Change the angle between the injected current and voltage back to 0°.
Decrease the current slowly until the START1 signal, start of stage 1, is
activated.
5.
Increase the current to 100 % of IBase.
6.
Switch the current off and measure the time for activation of TRIP1, trip of
stage 1.
7.
If a second stage is used: repeat points 2 - 6 for the second stage.

Completing the test

Continue to test another function or end the testing by setting the parameter
TestMode to Off under Main menu/Tests/IED test mode/1:TESTMODE. If
another function is tested, then set the parameter Blocked to No, under Main menu/
Tests/Function test modes/<Function group>/<Function>/<1:Function> for the
function, or for each individual function in a chain, to be tested next. Remember to
set the parameter Blocked to Yes, for each individual function that has been tested.

Directional over-power protection GOPPDOP

Prepare the IED for verification of settings as outlined in
verify
settings".
Values of the logical signals are available on the local HMI under: Main menu/
Tests/Function status/<Function group>/<Function>/<1:Function>. The Signal
monitoring tool in PCM600 shows the same signals that are available on the LHMI.
Formula used for complex power calculation
*
= ×
×
S
3
U
I
L
1
L
1
EQUATION1703 V1 EN
*
= ×
×
S
3
U
I
L
2
L
2
EQUATION1704 V1 EN
*
= ×
×
S
3
U
I
L
3
L
3
EQUATION1705 V1 EN
Section 5
Testing functionality
(Equation 10)
(Equation 11)
(Equation 12)