Secton 10 - Mantenance
30-Day Service
The 30 day maintenance procedure is a one-time procedure to be performed after the first 30 days
or 40 hours of usage. This procedure is normally performed every 150 hours or quarterly, whichever
comes first.
Maintaining the tires and wheels in good condition is essential to safe operation and good
performance. Tire and/or wheel failure could result in a machine tip-over. Component damage may
also result if problems are not discovered and repaired in a timely fashion.
1.
Check the tire surface and sidewalls for cuts, cracks, punctures and unusual wear.
2.
Check each wheel for damage, bends and cracks.
3.
Remove the wheel covers and check each center lock nut for proper torque.
Page 16
Castle Nut Torque, Dry
Castle Nut Torque, Lubricated
1330SE - Servce & Parts Manual
19 ft-Ibs / 26 Nm
14 ft-Ibs / 20 Nm
November 2021
Need help?
Do you have a question about the 1330SE and is the answer not in the manual?