Pilz PMCenergy SD Operating Manual page 20

Table of Contents

Advertisement

Commissioning
The commissioning
procedure
Operating Manual PMCenergy SD
1004547-EN-01
This procedure applies for "automatic setting of the operating
voltage on the DC link".
The brake resistor line is not connected in case for "fixed setting
of operating voltage on the DC link".
There is a risk of damage.
If a brake resistor is installed in the application, due to the the
parallel connection with the brake resistor installed in the
Dynamic Energy Storage Unit the current through the two resis-
tors may become excessive and destroy the brake transistor in
the application.
See the data sheet for the brake resistor.
If necessary, modify your application or consult the manufac-
turer.
Fig. 7: Connecting terminals on the bottom of the housing
Determine the polarity of the DC link connections.
De-energise the DC link.
Make sure that there is no voltage on the DC link.
Remove the discharge bridge
(grey terminal).
Make sure that there is no voltage between "–DC"
(red terminal).
between "–DC"
(black terminal) and "BR"
(black terminal) and "+DC"
20

Advertisement

Table of Contents
loading

Table of Contents