Transport / Storage / Installation; Checking The Delivery; Transporting The Dynamic Energy Storage Unit; Storing The Dynamic Energy Storage Unit - Pilz PMCenergy SD Operating Manual

Table of Contents

Advertisement

Transport / Storage / Installation

4
4.1
Scope of delivery

Checking the delivery:

4.2
4.3
4.4
Operating Manual PMCenergy SD
1004547-EN-01
T
/ S
RANSPORT
TORAGE
Checking the delivery
The Dynamic Energy Storage Unit leaves the factory in a tested and perfect condition.
Special packaging, consisting of cardboard, corrugated cardboard and protective
film, ensures safe transport.
There is a packing label on the outside of the packaging. This contains instructions
for transport, storage and proper handling which must be followed.
Any transport damage is the responsibility of the transport company.
• 1 × Dynamic Energy Storage Unit
• 1 × Operating Manual Dynamic Energy Storage Unit
Please see the delivery note for the exact scope of delivery.
Check the packaging for damage.
Immediately notify the transport company about any damage to the packaging
and/or the Dynamic Energy Storage Unit.
The transport company must receive a written damage report within 7 days.

Transporting the Dynamic Energy Storage Unit

Transport the Dynamic Energy Storage Unit to where it is to be installed in its
original packaging.
Avoid heavy vibrations and hard knocks.

Storing the Dynamic Energy Storage Unit

The Dynamic Energy Storage Unit must be stored in clean, dry areas.
Temperatures between -10° C and 85° C are permissible.
Any temperature fluctuations must not exceed 30 K per hour.

Unpacking the Dynamic Energy Storage Unit

Carefully remove the Dynamic Energy Storage Unit from its packaging.
Check that nothing is missing and that it is undamaged.
Dispose of the packaging in accordance with local regulations for cardboard boxes
and recyclable materials.
/ I
NSTALLATION
16

Advertisement

Table of Contents
loading

Table of Contents