Danfoss EM-PMI375 User Manual page 46

Hide thumbs Also See for EM-PMI375:
Table of Contents

Advertisement

User Guide
EM-PMI375
Installation
46 |
©
Danfoss | November 2021
2. Cut the cable sheath at the distance A from the end of the cable, see Figure below. Pull the cut part of
the sheath partly (length B is from 10 to 15 mm) off the cable as shown in the Figure. The distance A
depends of the length of the cable lug used. Measure with the cable lug that is used and cut to
suitable length.
Install two layers of copper tape on the cable so that the distance B is covered. Use 3M
Copper Foil Tape 1181 or similar.
The maximum distance between the copper tape or the shield (braid) of the cable and the
cable lug or the conductor (which ever is closer), is 10 mm.
Do not remove the cable sheath completely at this point and do not cut the braid screen of
the cable!
Cut length of the cable sheath
3. Insert the cable to the cable gland with slight turning motion. This helps the cable to go through the
spring inside the cable gland. Push the cable gland against the sheath of the cable as shown in Figure
below.
Cable to the gland assembly
BC265856307805en-000202

Advertisement

Table of Contents
loading

Table of Contents