Mitsubishi Electric FR-F806-E Hardware Instruction Manual page 144

Inverter for fans and pumps, ip55/ul type 12
Table of Contents

Advertisement

 Emergency drive operation selection (Pr.523, Pr.524)
• Use Pr.523 Emergency drive mode selection to select the emergency drive operation. Set a value in the
hundreds place to select the operation when a valid protective function is activated (critical fault) during
emergency drive. Set values in the ones and tens places to select the operation method.
Pr.523
Emergency drive operation mode
setting
1[][]
Output shutoff mode
2[][]
Retry / output shutoff mode
*1
Retry / commercial mode
3[][]
*1
Commercial mode
4[][]
[]00
Normal operation
[]11
Forward rotation
Fixed
frequency
[]12
Reverse rotation
mode
[]21
Forward rotation
[]22
Reverse rotation
Forward rotation
PID control
[]23
(Second PID
mode
measured value input)
Reverse rotation
[]24
(Second PID
measured value input)
9999
Emergency drive disabled.
*1
Under PM motor control, the operation is not switched over to the commercial power supply operation and the output is shut off.
NOTE
• The operation is automatically switched from the PU operation mode or External/PU combined operation mode to
the External operation mode when the emergency drive is activated in the fixed frequency mode or in the PID control
mode.
Output shutoff at a critical fault occurrence.
Retry operation at a critical fault occurrence. (Output
shutoff at the occurrence of a fault for which retry is not
permitted.)
The output is shut off when a critical fault for which retry
is not permitted occurs, or the retry count is exceeded.
Selecting operation
Retry operation at a critical fault occurrence. (Electronic
when a critical fault
bypass at the occurrence of a critical fault for which retry
occurs during
is not permitted.)
emergency drive
The operation is switched over to the commercial power
operation
supply operation when a critical fault for which retry is
not permitted occurs, or the retry count is exceeded.
While Pr.515 = "9999", the operation is switched over to
the commercial power supply operation when the retry
count reaches 200.
The operation is switched over to the commercial power
supply operation when a critical fault occurs.
The operation is performed with the same set frequency
and by the same starting command as those in the
normal operation.
Use this mode to avoid output shutoff due to a fault.
The operation is forcibly performed with the frequency
set in Pr.524.
Even when the motor is stopped, the operation is started
Selecting the operation
by the emergency drive operation.
method during
The operation is performed under PID control using the
emergency drive
Pr.524 setting as a set point. The measured values are
operation
input in the method set in Pr.128.
The operation is performed under PID control using the
Pr.524 setting as a set point. The measured values are
input in the method set in Pr.753.
2
Description
BCN-C22005-963

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents