Yamaha YZF-R1 2020 Service Manual page 67

Table of Contents

Advertisement

1. Auxiliary light lead
2. Steering damper solenoid coupler
3. Intake solenoid lead (sub-wire harness)
4. Steering damper solenoid lead
5. Front turn signal light lead (right)
6. Meter assembly
7. Meter assembly coupler
8. Intake solenoid vacuum hose
9. Front turn signal light lead (left)
10. Wire harness
11. Headlight assembly
12. Headlight cover
13. Fuse box 2
14. Front cowling
A. Route the auxiliary light lead under the wire
harness.
B. Place the steering damper solenoid lead and
intake solenoid lead (sub-wire harness) in the gap
between the front cowling and front cowling
assembly stay.
C. Route the front turn signal light lead (right) under
the steering damper solenoid lead and intake
solenoid lead (sub-wire harness).
D. To front turn signal light (right)
E. Install the holder on the steering damper solenoid
lead to the curved section of the slit used for
connecting the lead in the headlight assembly.
F. Install the meter assembly coupler and coupler
cover securely to the meter assembly. Make sure
that the edges of the coupler cover are not rolled
up.
G. Fasten the intake solenoid vacuum hose with the
holders on the wire harness (2 locations).
H. Insert the projection on the wire harness holder
into the hole in the side cover bracket from the
inside.
I.
To front turn signal light (left)
J. Fasten the intake solenoid vacuum hose, front turn
signal light lead (left), and auxiliary light lead with
the holder. Position the holder to the outside of and
above the head light control unit holder. The catch
of the holder may be facing in any direction.
K. Face the holder on the steering damper solenoid
lead downward, and then install the holder
completely onto the rib of the headlight assembly.
L. Connect the front turn signal light coupler (right),
and then fasten the front turn signal light leads
(right) with the holder as shown in the illustration.
The leads may be routed in any order.
M. To intake solenoid
N. Install fuse box 2 onto the rib of the front side
cowling inner panel (left).
O. Insert the projection on the wire harness holder
into the hole in the front cowling from the inside.
P. Position the plastic locking tie to the outside of the
intake solenoid vacuum hose and front turn signal
light lead (left).
2-28
CABLE ROUTING

Advertisement

Table of Contents
loading

Table of Contents