6 Final check

This chapter describes the instructions to check that all the connections and settings have been successfully
done.
1) Make sure that the CAN communication wire from the PYLONTECH battery to the inverter is
connected.
2) Make sure that the battery circuit breaker is in ON position.
3) Make sure that the inverter is turn-on from the battery and doesn't show communication Error with
BMS.
Technical Guide
19/11/2020
INGECON SUN STORAGE 1Play
9/11