Section 9- Toggle Installation - Holland TG Series Installation Manual

2500/3000/3500 lb. capacity
Table of Contents

Advertisement

9. Toggle Installation
NOTE:
Verify the vehicle power supply is disconnected
prior to installing the toggle.
1. Position the toggle in a location that is accessible from
the ground and deck level.
2. Run and secure the control station cable under the
vehicle chassis to the pump box.
3. Feed the control station cable through the strain relief
on the back of the pump box (Figure 28).
4. Connect the green wire from the control station cable
to the power side terminal of the pump solenoid
(Figure 29).
5. Connect the white wire from the control station cable
to the coil with white wire from the diode harness
(Figure 29).
6. Connect the black wire from the control station cable
to the coil with black wire from the diode harness
(Figure 29).
7. Coil the excess control station cable inside the pump
box.
Figure 29
BLACK WIRE
FROM CONTROL
STATION (DOWN}
DIODE HARNESS
BLACK WIRE (DOWN)
GREEN WIRE FROM
CONTROL STATION
(POWER SIDE)
XL-TG10149IM-en-US Rev A 12-10 Amendments and Errors Reserved. © SAF-HOLLAND, Inc.
Figure 28
STRAIN RELIEF
Toggle Installation
WHITE WIRE
FROM CONTROL
STATION (UP}
DIODE HARNESS
WHITE WIRE (UP)
17

Advertisement

Table of Contents
loading

Related Products for Holland TG Series

Table of Contents