Section 7- Pump Assembly Installation - Holland TG Series Installation Manual

2500/3000/3500 lb. capacity
Table of Contents

Advertisement

Pump Assembly Installation
7. Pump Assembly Installation
Main tube Mount (Standard Option)
Truck & Trailer Installation
1.
Using the supplied fasteners, fasten the pump
assembly to the end of the main tube
2. Torque nuts to 30-40 Ft-Lbs.
Side Mount Box
1.
Locate the pump box behind the curbside mud flap
under the vehicle no more than 4' from the back of the
vehicle and 6" in from the curbside of the vehicle body
(Figure 21).
2. Position the pump assembly brackets against the truck
cross members and weld per Figure 22.
14
Figure 20
(Figure 20).
Figure 21
Figure 22
XL-TG10149IM-en-US Rev A 12-10 Amendments and Errors Reserved. © SAF-HOLLAND, Inc.
MAIN TUBE BRACKET
SUPPLIED
FASTENERS
4'
1/4"
TYP

Advertisement

Table of Contents
loading

Related Products for Holland TG Series

Table of Contents