Holland TG Series Installation Manual page 13

2500/3000/3500 lb. capacity
Table of Contents

Advertisement

9. Use the platform adjusting bolts to lock the main tube
in position (Figure 18).
10. Once satisfied with the main tube positioning, weld the
liftgate attaching plates to the main tube and to the
vehicle frame per Figure 19.
NOTE:
When welding is required, ensure that the
battery ground cable is disconnected and
that all electrical equipment is completely
electrically isolated before welding is
initiated.
Failure to isolate electrical equipment
from ground prior to welding could
result in overload which, if not avoided,
may result in property damage.
Figure 19
BOTH
ATTACHING
PLATES
1/4"
XL-TG10149IM-en-US Rev A 12-10 Amendments and Errors Reserved. © SAF-HOLLAND, Inc.
Figure 18
ADJUSTING BOLTS
MAIN TUBE
Liftgate Installation
ATTACHING PLATES
VEHICLE FRAME
BOTH
ATTACHING
1/4"
PLATES
13

Advertisement

Table of Contents
loading

Related Products for Holland TG Series

Table of Contents