When You Unpack Your Pump; Unpacking Your Pump; Packaging Disposal; Inspection - Watson-Marlow 730 Bp Installation, Operating And Maintenance Manual

Table of Contents

Advertisement

3

When you unpack your pump

3.1

Unpacking your pump

Unpack all parts carefully, retaining the packaging until you are sure all components are present and in
good order. Check against the components supplied list, below.
3.2

Packaging disposal

Dispose of packaging materials safely, and in accordance with regulations in your area. The outer carton
is made of corrugated cardboard and can be recycled.
3.3

Inspection

Check that all components are present. Inspect components for damage in transit. If anything is missing
or damaged, contact your distributor immediately.
3.4

Components supplied

730 Components
730 pump drive unit, fitted with 720R or other pumphead if specified as a pump
l
The designated power cable (attached to the pump drive unit)
l
A 730N module providing pump ingress protection to IP66, NEMA 4X
l
Note: the module is attached for transit, but must be removed to allow wiring up, voltage selection
l
and fuse inspection and then re-affixed before the pump is operated.
Product safety information booklet incorporating quick start manual
l
3.5

Storage

This product has an extended shelf life. However, care should be taken after storage to ensure that all
parts function correctly. Please observe the storage recommendations and use-by dates which apply to
tubing you may wish to bring into service after storage.
6
m-730bpn-en-08.1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents