5 Installation
5.1 Basic installation requirements
A. The installation location must be suitable for SPH's weight for a long period time
B. The installation location must conforms with dimension of SPH
C. Do not install the unit on structures constructed of flammable or thermo labile materials
D. The ingress Protection rate is IP65 and the pollution degree is PD2. Please refer to the below: