Growatt SPH Series Operation Manual

Growatt SPH Series Operation Manual

Hide thumbs Also See for SPH Series:
Table of Contents

Advertisement

Growatt New Energy
Download
Manual
Shenzhen Growatt New Energy Technology CO.,LTD
No.28 Guangming Road, Shiyan Street, Bao'an District,
No.28 Guangming Road, Shiyan Street, Bao'an District,
Shenzhen, P.R.China
Shenzhen, P.R.China
T
+86 0755 2747 1942
+86 0755 2747 1942
E
service@ginverter.com
service@ginverter.com
www.ginverter.com
www.ginverter.com
W
GR-UM-158 A-00
GR-UM-158 A-00
-
-
Installation
&
Operation Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPH Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Growatt SPH Series

  • Page 1 Installation & Operation Manual Growatt New Energy Download Manual Shenzhen Growatt New Energy Technology CO.,LTD No.28 Guangming Road, Shiyan Street, Bao’an District, No.28 Guangming Road, Shiyan Street, Bao’an District, Shenzhen, P.R.China Shenzhen, P.R.China +86 0755 2747 1942 +86 0755 2747 1942 service@ginverter.com...
  • Page 2 2 Safety Purpose Use 2.2 Safety Measure 2.3 Symbols introduction on the SPH inverter 3 Product Description Growatt SPH series inverter 3.2 Label Explanation 3.3 Size and weight 3.4 The advantage of the unit of Growatt SPH Unpacking 5 Installation...
  • Page 3 11.4 Disposing of theSPH inverter 6.4 Display and button 6.5 Communication 12 Product specification Start-up and shut down 14.1 Growatt SPH series energy 7.1 Start-up the SPH system system storage machine product specification 7.2 Disconnect the SPH system 14.2 DC input terminal parameter 14.3 Torque...
  • Page 4 Overview: 1.1 Preface This manual will provide the users who use the Growatt SPH TL3 BH Series of Shenzhen Growatt New Energy Technology Co.,LTD(Short for Growatt as below) with the detailed product information and the installation instructions. Please read this manual carefully and put this manual on some place where is convenient to installation, operation, obtain.
  • Page 5 5%-85%. If the chosen PV modules needs to 7.Use the equipment to combined to grid needs to obtain the permission of local power positive or negative ground connection, please contact with Growatt for technical supply department.
  • Page 6: Product Description

    Direct Current(DC) Alternating Current(AC) The machine complies with the requirements of the applicable CE guidelines Refer to the operating instructions. 3 Product Description 3.1 Growatt SPH series inverter Marks of SPH Mark Description Explanation Operation of display screen and set system...
  • Page 7 Battery data Battery voltage range 160~550Vdc Max. charge and discharge current Type of battery Lithium / Lead-acid 3.4 The advantage of the unit of Growatt SPH Others Safety level ClassⅠ Features below: Ø All in one design. Can improve self consumption, back up and also pinch the valley.
  • Page 8: Unpacking And Inspection

    A. The installation location must be suitable for SPH's weight for a long period time. please contact with supplier. B. The installation location must conforms with dimension of SPH. Growatt SPH series and accessories shows as follows: C. Do not install the unit on structures constructed of flammable or thermo labile materials.
  • Page 9 H. Installation position shall not prevent access to the disconnection means. I. In order to ensure machine can run normally and easy to operate, please pay attention Description to provide adequate space for SPH, Please refer to below: Press the RJ45 terminal Press battery terminal connector Disconnect PV terminal Unscrew nut...
  • Page 10: Installation Instructions

    4.Drill four Ф8 holes at the mark point, the depth is not less than 55mm. 5.Knock four explosion bolt into Ф8 holes (As the chart 5.8b below). Growatt SPH4000-10000TL3 BH only use meter as its sensor, before installing your 6.Hang the energy storage machine on the four setscrews (As the chart 5.8c below).
  • Page 11 MC4 PV terminal, the detail steps are as follows: max cable length Step 1: Turn off PV switch. Step 2: Insert PV panel positive and negative cables into MC4 terminal,then connect conductor cross section Growatt Growatt Growatt Growatt Growatt...
  • Page 12 Step 3: Push threaded sleeve on to connection terminal until both are locked tightly. Chart 5.16 Step 3: Push threaded sleeve on to connection terminal until both are locked tightly. Chart 5.13 Step 4:Plug the socket into AC output terminal,clockwise rotation to tighten the socket, counterclockwise rotation to loosen the socket.
  • Page 13 Ø If you want to use on gird and off grid, you can use ATS (automatic transfer switch) like chart 5.15 and 5.16 before or ask Growatt for help to connect them. Ø The first start of system needs Grid power.
  • Page 14 Step9: Screw the swivel nut onto the waterproof cover. Note: Ø Max battery input power : 10000W 1. Meter must be provided by Growatt. If not, maybe meter can't communicate with SPH inverter. Remark: 2. The more detail describe of meter installation, please turn to meter user manual.
  • Page 15 Chart 5.28 Chart 5.26 Remark: Meter wire (5m in length) specification: RJ45, standard LAN line (one end with 8P modular plug, the other connected with transformer). But if the length is not enough, customer can add cable, so the length can be increased to 15m max, the operation is as follow chart: Chart 5.27 5.4.5 Connection of communication terminal for lithium battery (CAN)
  • Page 16 5.4.6 Connection of RS 485 (reserved) terminal 5.4.7 Connection of DRMS terminal(Australia only) RS 485 reserved communication interface, can be used for meter communication, please When SPH is applied to Australia, the DRMS terminals need to be connected, the connect the terminal (RJ45) as follows: connection way appears as follows: Step1: Unscrew the swivel nut from the cable gland.
  • Page 17 RJ45 terminal pin assignment assignment for inverter scapable of both charging and discharging DRM5 DRM6 DRM7 DRM8 RefGen COM/DRM0 Method of asserting demand response modes MODE Rj45 socket asserted by shorting pins Requirement operate the disconnection device DRM0 Chart 5.34 DRM5 Do not generate power Do not generate at more than 50% of...
  • Page 18 5.4.9 Connection of Dry contact 5.4.10 Grounding connection The dry contact is used to communicate with external devices (such as remote start hot SPH must be grounded by cable, the grounding point is showed as follow, and the water heater). The wiring steps are as follows: minimum grounding cable wire diameter is 10.0mm2.
  • Page 19 Commissioning 6.1 Commissioning of SPH Ÿ Backup mode Electrify SPH after all installation of Part5 be finished, here are the steps: If Grid lost, system would turn to backup mode (user can disable it, refer to 6.3.4) and AC Ø Connect PV output from EPS LOAD port, all the energy from PV and battery, if the PV also lost, then only battery discharge.
  • Page 20 After all the actions are done, you still have to wait for more than 5 minutes. 6.3 Country setting Queensland Growatt can provide various regulations of the machine, after customers receive the GT0XXXXXX2 machine, according to their country, by dialing DIP switch to set the corresponding regulations.
  • Page 21 GT1XXXXXX2 EN50549-Norway TAIWAN GT0XXXXXX9 EN50549-Poland GT0XXXXXXB GT1XXXXXX3 EN50549-Ireland Hungary GT0XXXXXXC India GT1XXXXXX4 Belgium GT0XXXXXXD Brazil GT1XXXXXX5 GT0XXXXXXE Thailand MEA EN50549-Sweden GT1XXXXXX6 Thailand PEA GT0XXXXXXF Denmark GT1XXXXXX7 Spain GT1XXXXXX0 AS4777-NEW Zealand GT1XXXXXX8 CQC-1 GT1XXXXXX1 France GT1XXXXXX9...
  • Page 22 6.4.2 LED and button instruction 6.4 Display and button 6.4.1 LCD display area Normal Vb / Cb: 488.0 V 88% Chart 6.3 Description Location Status ESC- button(cancel control) Chart 6.2 Down-button Enter-button Location Description UP-button State Notice: Information LED showing status of SPH, it has two colors, one is green and another is red. Please turn PV input (if you connect two tracks, it will show two.
  • Page 23 6.4.4 work mode set up The A line's concluding information as follow: Ø Standby state: SPH is in standby state. No error in this state, but for other reasons, You can enter set up page by long press “enter” for 3S, in this page, you can press make it in a wait state.
  • Page 24 1.Under the Basic Para, you can see the setup options below after pressing Enter for 1S: 3.Under the Priority, you can see the setup options below after pressing Enter: Press “enter” key more Press “enter” key more Press “enter” key more Press “enter”...
  • Page 25 RS232 connection with machine and PC, using the shinebus software developed by Growatt. Export Limit is used for users to control the energy flowing to the grid.If this function is About ShineBus software, when you needed, please download from official website of enabled,the feeding power to grid will be equal or less than the setup value.The purpose...
  • Page 26 Note: 5.Pull up AC PLUG connection. This monitoring devices can only be used with Growatt's Shineserver / shinephone 6.Waiting until LED, LCD display have gone out, the SPH is shut down completely. monitor platform. Wi-Fi-S / Shinelink are connect with inverter via RS232 interface and use computer terminal / or mobile phone for data monitoring.
  • Page 27: Maintenance And Cleaning

    Q&A program. SPH inverter stops working. Growatt SPH series inverter without fan so belongs to When SPH inverter fault happens, please inform our company, and to provide SPH...
  • Page 28 Please refer to the local grid 2.Restart inverter. AC F Outrange 1.Check the real voltage of battery. standard for more details for 3.Please contact Growatt service Battery Voltage Lower Bat Voltage Low 2.Check the wire of battery and the grid voltage.
  • Page 29: Eu Declaration Of Conformity

    •2014/30/EU Electromagnetic Compatibility Directive (EMC) •2011/65/EU RoHS Directive and its amendment (EU)2015/863 Shenzhen Growatt New Energy Technology Co. Ltd confirms that the Growatt inverters and accessories described in this document are in compliance with the above mentioned EU directives. The entire EU Declaration of Conformity can be found at www.ginverter.com.
  • Page 30 12 Product specification 12.1 Growatt SPH series energy storage machine product < 3% THDV specification < 0.5S Switch time Battery data(DC) Model SPH 4000 SPH 5000 SPH 6000 SPH 7000 SPH 8000 SPH 10000 Battery voltage range 160~550V Tl3 BH...
  • Page 31 The following chart is the energy storage machine optional appendix list, if there is a AS/NZS 4777 , G98 need please contact the Growatt New Energy Technology Co., Ltd or dealer orders.(P/N is EN61000-6-1, EN61000-6-3 only for reference,and it may be changed)
  • Page 32 13 Certificate Annex: Growatt SPH series inverter apply within the scope of the world, So the inverter have to AutoTest (only for Italy) satisfy different countries and regions of different safety standards. Follow is the chart of Auto Test, refer to 6.4.4. in the set up surface of “Auto Test”. Press the “enter”...