Summary of Contents for Growatt SPH TL BL-UP Series
Page 1
Installation Manual of SPH series Growatt New Energy Installation Manual Download Manual & Shenzhen Growatt New Energy Technology CO.,LTD No.28 Guangming Road, Shiyan Street, Bao’an District, No.28 Guangming Road, Shiyan Street, Bao’an District, SPH TL BL-UP series Shenzhen, P.R.China Shenzhen, P.R.China...
Page 2
1.4 Safety Instructions Safety 2.1 Purpose Use 2.2 Safety Measure 2.3 Symbols introduction on the SPH inverter Product Description 3.1 Growatt SPH series inverter 3.2 Label Explanation 3.3 Size and weight 3.4 The advantage of the unit of Growatt SPH Unpacking...
Page 3
6.3 Country setting 12.4 Disposing of the SPH inverter 6.4 Display and button 6.5 Communication Product specification 13.1 Growatt SPH series energy Start-up and shut 7.1 Start-up the SPH system down SPH system storage machine product 7.2 Disconnect the SPH system specification 13.2 DC input terminal parameter...
Page 4
Brief Introduction Overview: 1.1 Preface This manual will provide the users who use the Growatt SPH Series of GROWATT NEW ENERGY TECHNOLOGY CO.LTD.SHENZHEN(Short for Growatt New Energy as below) with the detailed product information and the installation instructions. Please read this manual carefully and put this manual on some place where is convenient to installation, operation, obtain.
Page 5
PD2, meanwhile the temperature should be control in ℃ the 0-40 of indoor ventilation and the humidity should be 5%-85%. If the chosen PV modules needs to positive or negative ground connection, please contact with Growatt for technical support before installation.
Page 6
2.3 Symbols introduction on the SPH inverter 2.2 Safety Measure PV modules Capacitive Discharge Currents Symbol Description PV modules with large capacities relative to earth, such as thin-film PV modules with cells on a metallic substrate, may only be used if their coupling capacity does not exceed 470nF.
Page 7
Product Description 3.2 Label Explanation 3.1 Growatt SPH series inverter Label contains the following information: for example SPH 6000TL BL-UP shows as below: Marks of SPH Mark Description Explanation Push-button Operation of display screen and set system Green light on...
Page 8
Item Number Description SPH inverter User Manual Paper board(installation guide) 3.4 The advantage of the unit of Growatt SPH Waterproof cover AC Grid connector(Austrialian machine terminal is different) UPS output connector Features below: Communication cable ·All in one design. Can improve self consumption, back up and also pinch the valley.
Page 9
Installation H. Installation position shall not prevent access to the disconnection means. I. In order to ensure machine can run normally and easy to operate, please pay attention to provide adequate space for SPH, please refer to below: 5.1 Basic installation requirements A.
Page 10
5.3.1 Attention Layout(length of sensors consider) Press battery terminal connector There're three types of sensors for use with Growatt SPH. One is wired current sensor, Disconnect PV terminal one is meter sensor, or RailLog, if you choose wired sensor or meter . Before installing...
Page 11
5.3.2 Installation of SPH 1.Project the machine's probably size on the wall; The thickness of wall for SPH must be not less than 60mm. 2.Make sure the drill position, use paper board(installation guide), put the paper board cling to the wall, make sure the top edge of paper board is level( As the chart 5.8a below).
Page 12
Chart 5.11 5.5 SPH System electrical connection Decisive Voltage Class (DVC) indicated for ports Similar to the traditional inverter connecting, the input of PV panel energy can be realized by using MC4 PV terminal, the detail steps are as follows: Port Name Class 1.Turn off PV switch.
Page 13
Wire suggest length: Step 3:Push threaded sleeve on to connection terminal until both are locked tightly Max cable length Conductor cross Growatt Growatt Growatt Growatt Growatt Growatt section SPH3000 SPH5000 SPH6000 SPH3600 SPH4000 SPH4600 5.2mm 10AWG Chart 5.16 6.6mm 9AWG...
Page 14
Note: This diagram is an example for gird system without special requirement on Step 3: Push threaded sleeve on to connection terminal until both are locked electrical wiring connection. tightly. SPHInverter ACGRID UPS OUTPUT Battery Sensor chart 5.20 Step 4: Align the bayonet of the AC output terminal to the slot of thread sleeve, Plug the socket into AC output terminal.
Page 15
6.If you want to use on gird and off grid, you can use TSSP (transfer switch single phase) like chart 5.22 and 5.23 before or ask Growatt for help to connect them. TSSP is using to switch when SPH is not working or in fault mode. For example: if SPH is in fault mode but there is Grid power.
Page 16
Chart 5.30 Chart 5.28 Note:We suggest the distance between battery and SPH no longer than 1.5m, and the power line area must be larger than 5 AWG. 5.5.4 Connection of CT terminal There is a CT in SPH inverter monitoring the power consumption situation of residential users, the CT terminal connection steps are as follows: 1.Unscrew the swivel nut from the cable gland.
Page 17
CT or electricity meter, please refer to section 6.3.3 for details. to the direction of the current in live wire from Grid to Load. Sensor needs to be 2.Meter must be provided by Growatt. If not, maybe meter can't communicate placed in the power distribution cabinet.
Page 18
Chart 5.37 Chart 5.39 Note: Note: 1.If you are using a lead-acid battery, you do not need to install this communication 1.If you are using a lead-acid battery, you do not need to install this cable. communication cable. 2.The CAN battery communication and 485-2 battery communication can't be 2.The CAN battery communication and 485-2 battery communication can't be installed at same time, please select the correct communication method according to installed at same time, please select the correct communication method according...
Page 19
Note: For UK:This equipment is equipped with RJ45 terminal for logic interface that being received the signal from the DNO, the connection should be installed per installation manual, and the signal should be a simple binary output that captured by RJ45 terminal( PIN 5 and 1 for detecting the signal). Once the signal actived, the inverter will reduce its active power to zero within 5s.
Page 20
Chart 5.43 Note: Chart 5.45 1.If you are using a lithium battery, you do not need to install this temperature probe, the probe of the temperature cable should be attached to the surrounding environment of the lead-acid battery, and the length of this cable is 1.5m, so pay Note: attention to the distance of battery and SPH.
Page 21
Commissioning 2.Battery first: When SPH working in this mode, battery would be charged first, it's 6.1 Commissioning of SPH suitable working on the period when the electric charge is low. User need to set Electrify SPH after all installation of Part5 be finished, here are the steps: the mode ON and OFF time, and the end time of battery SOC.
Page 22
The SPH's intelligent control system could monitor and adjustment system's status continuously, when SPH inverter monitoring anything unexpected happen, such Growatt can provide various regulations of the machine, after customers receive the machine, according to their country, by dialing DIP switch to set the as NO PV and NO battery ,the LCD will display the bypass information, in bypass corresponding regulations.
Page 23
6.3.1 Switch to country table T0XXXXXXFG Thailand PEA* DIP switch status Country/region / regulations Model display VDE 0126* GT0XXXXXX1 EN50438-Ireland* GT1XXXXXX3 GT1XXXXXX7 DK1(Danmark)* GT0XXXXXX3 AS4777-Australia* GT1XXXXXX8 New Zealand* CEI 0-21* GT0XXXXXX4 France* GT1XXXXXX9 G99* GT0XXXXXX5 South Africa GT1XXXXXXC VDE-AR-N 4105* GT0XXXXXX7 Note: “*”means that we didn't do the certification, but can meet with the requirement.
Page 24
6.4 Display and button 6.4.2 LED and button instruction 6.4.1 LCD display area Chart 6.3 Location Description Status Chart 6.2 ESC- button(cancel control) Location Description Down-button State Enter-button Information PV input (If you connect two tracks, it will show two. UP-button Otherwise show one) Notice:LED showing status of SPH, it has two color, one is green and another is red.
Page 25
Note: The A line's concluding information as follow: 1.“Down” control command (if pushing “up” button, command will go back) 1.Standby state: SPH is in standby state. No error in this state, but for other reasons, make it in a 2.Workmode depend on the situation. If SPH is normal state, it will show wait state.
Page 26
In the basic Parameter,you can set language (English,Italian ,German ),system time , 4.Under the MODE Change ,you can see the setup options below after pressing Enter: lead-acid cell charging voltage (default is 58V),discharge low voltage (default is 48V)and lead-acid constant current(default is 75A). Press “enter”...
Page 27
SPH. For example Using Wi-Fi-S monitor SPH as follow: Note: This kind of monitoring can only be used by the monitor of Growatt's Shineserver /shine phone provided by the company. Through RS232 interface connect to Wi-Fi- S/shinelink/GPRS, use computer terminal/or mobile phone for data monitoring.
Page 28
Heat dissipation performance is very important when SPH inverter work under the environment of high temperature, better heat dissipation can reduce the possibility of SPH inverter stops working. Growatt SPH series inverter without fan so belongs to natural cooling, hot air from the top of the radiator, tie-in battery,...
Page 29
PV1 or PV2 Reinserted the PV terminal, please contact Warning203 Brief description of problems Circuit short Growatt service center if restart can't solve The battery voltage the problem. The PV input voltage and power per string. Battery temperature Check the environment temperature of ...
Page 30
Error 405 Relay fault Restart inverter. if restart can't solve the problem. Please refer to the local Please contact Growatt service center if Output High DCI grid standard for Restart inverter. restart can't solve the problem. Autotest failed disconnection time...
Page 31
Growatt-SPH4000 TL BL-UP. Growatt-SPH4600 TL BL-UP. The liability of Growatt in respect of any defects in its machines shall be limited to Growatt-SPH5000 TL BL-UP. compliance with the obligations as stated in these terms and conditions of warranty. Growatt-SPH6000 TL BL-UP.
Page 32
Decommissioning Product Specification 13.1 Growatt SPH series energy storage machine product 12.1 Dismantling the energy storage specification 1. Disconnect the storage machine such as mentioned in section 7. Model Growatt Growatt Growatt Growatt Growatt Growatt 2. Disconnect the upper cable of SPH inverter.
Page 33
Model Model Growatt Growatt Growatt Growatt Growatt Growatt Growatt Growatt Growatt Growatt Growatt Growatt SPH3000 SPH3000 SPH3600 SPH4000 SPH4600 SPH5000 SPH6000 SPH3600 SPH4000 SPH4600 SPH5000 SPH6000 Specifications Specifications Phase factor at BAT reverse rate power protection Displacement 0.8leading 0.8leading 0.8leading 0.8leading...
Page 34
The following chart is the energy storage machine optional appendix list, if there is a yes /opt yes /opt yes /opt / 10 years need please contact the Growatt New Energy Technology Co., Ltd or dealer Certificates and approvals orders.(P/N is only for reference,and it may be changed.) Grid regulation NRS 097-2-1...
Page 35
Annex Certificate Growatt SPH series inverter apply within the scope of the world, So the inverter have Auto Test (only for Italy) Follow is the chart of Auto Test, refer to 6.4.4. in the set up surface of “Auto Test”.
Need help?
Do you have a question about the SPH TL BL-UP Series and is the answer not in the manual?