Download Print this page

Bestop 17175 Installation Instructions Manual page 4

Ez roll tonneau for nissan titan crew cab

Advertisement

EZ Roll Tonneau Installation Instructions
Center Tonneau Frame
With the Tonneau Cover Assembly latched on both
sides, push both Side Rails in so they are fl ush
with the Front Rail. Center the front of the Frame
from side to side on the vehicle.
For proper function, it is best to leave
a 1/8" gap between the Side Rail and
Front Rail.
Center Frame
from Side to Side
Tighten Front Clamps
Tighten the front Clamp on each side until the Lock
Washer is compressed.
Tighten Front
Clamps
Rev. D 0911
Roll Out Cover
Roll out the cover. Make sure that each bow falls
between the Side Rails.
Bow
Secure Rear Rail To Rear
Pivot Mounts
Rotate the Rear Rail into the rear Pivot Mounts on
both sides. It will only latch on the driver's side.
Center Rear of Frame
Push the Side Rails fl ush against the Rear Rail and
center the rear of the Frame from side to side on
the vehicle.
For proper function, it is best to leave
a 1/8" gap between the Side Rail and
Rear Rail.
Side Rail
Rotate Rear Rail
into Pivot Mounts
Center Frame
from Side to Side
17175 pg. 4

Advertisement

loading