Shaker Wall Panelling
*supplied separately
Components supplied
x5 Wall Panel - 800 x 441mm
Installation
Fix the anchor point section to the wall using adhesive.
1
This can be positioned in a corner of the room, door opening or centre
of the wall (for symmetrical layout). If the run is less than 2m in length
always start from the wall.
Note: Anchor point must be straight/level.
Anchor Section
Corner of room start point application shown
3
Remove the panel and apply adhesive to the back of the panel.
Peel backing from adhesive strip and fit the panel to the wall.
Note: Alternatively panels can be pinned in position.
Panel Back
HD715081
Architrave/Dado*
Shaker Panelling
(800mm)
Skirting
Board*
(per pack)
x1 End Stile - 800 x 100mm
Adhesive
Adhesive
Strip
Remove packaging and place panels in the room intended
Ensure walls are clean, smooth and level with any
We recommend panels are cut as required during the installation process
Panelling is supplied primed and can be finished in paint
following the manufacturers guidelines. Lightly sand as required.
Panelling is splash-proof but must not be submerged
x1 Anchor - 500 x 45mm
Mark the height of the panel from the lowest
2
point. Place the first panel against the wall aligning
with the anchor section to ensure square and level.
Position and join the panels together preparing
4
each panel as required. Press firmly to the wall.
Note: Ensure sections are fully located.
Fit all panelling to the wall.
SWPLE1
Important Notes:
Ensure packaging is disposed of in a safe
environmentally friendly way.
for panelling 48hrs before installation.
loose wall paper or paint removed.
to ensure an accurate fit.
or subjected to constant running water.
Need help?
Do you have a question about the SWPLE1 and is the answer not in the manual?
Questions and answers