6.13 Bucket Maintenance
Caution!
Notice!
09.2020
–
Avoid the injury caused by the flyout of metal filling or
fragments in case of hitting out or in the connecting pin
–
Wear the safety goggles/safety glasses, gloves and safety
appliances applicable for operation.
Replace the bucket
–
Park the machine on flat ground. Lower the bucket to ground, fix
its plane on the ground, and ensure the pin shaft can't be rolled
after removing the pin shaft.
–
Slide O-ring out as shown in Figure.
–
Remove bucket pin shafts A and B, separate the arm and bucket,
clean pin shaft and pin hole, and apply enough lubricating oil to
pin shaft and pin hole.
–
Align the arm and new bucket, and ensure the bucket can't roll.
–
Attach the bucket pin shafts A and B.
–
Attach the lock pin and retaining ring to pin shafts A and B.
–
Adjust connecting clearance of bucket at pin shaft A (see "Adjust
connecting clearance of bucket").
–
Apply the grease to pin shafts A and B.
–
Start the engine and run it at low idle speed. Turn the bucket
slowly in both directions to check if the rotation of bucket is
disturbed. Don't use any disturbed machine. If any disturbance,
deal with it in time.
Seite 161 / 197