Raven Hawkeye 2 Installation Manual page 29

For case ih patriot/trident (my 2017 and newer)
Hide thumbs Also See for Hawkeye 2:
Table of Contents

Advertisement

NOTE:
Keep the boom connections clean and off the ground while routing.
Do not secure cables with cable ties until all cables are in place and routings are checked for pinch
points and other interferences.
Ensure sufficient slack is available at fold and break-away joints to allow for full range of motion
without stretching the cable.
4. Next, repeat step 1 through 3 for the inner boom cable for the opposite side.
5. Continue routing both mid and outer boom cables, and repeat step 1 through 4 for both mid and outer boom
cables.
NOTE:
The connector with the rotating locking collar will always go towards the center of the machine.
6. If not already applied, apply a single, short burst of corrosion inhibitor. Corrosion X HD (P/N 222-0000-020 or
available from http://www.corrosionx.com/corrosionx-heavy-duty.html) is recommended.
FIGURE 3. Boom Cable Routing - Over Mid Fold Joint
7. Be sure the corrosion inhibitor has coated the NCV contacts and recessed portions of the connector.
NOTE:
To determine if corrosion inhibitor has been applied, inspect for a thick liquid in the bottom of the
connector.
Hawkeye® 2 NCV and Boom Cable Installation: Boom Cable Routing and Connection
HAWKEYE® 2 NCV AND BOOM CABLE INSTALLATION
25

Advertisement

Table of Contents
loading