Important will WARRANTY Yetter Manufacturing warrants all products manufactured and sold by it against defects in material. This warranty being expressly limited to replacement at the factory of such parts or products as shall appear to be defective after inspection.
Page 3
SAFETY PRECAUTIONS A brief description of signal words that may be used in this manual: CAUTION: Used as a general reminder of good safety practices or to direct attention to unsafe practices. WARNING: Denotes a specific potential hazard. DANGER: Denotes the most serious specific potential hazard. CAUTION Consult your implement and tractor operator’s manual for correct and safe operating practices.
John Deere MaxEmerge 2, Plus and Pro planters. The other brackets will fit old style 7000 John Deere units, Kinze, White 6000, White 9000, and Yetter planter row units. Several different styles of blades are available for every tillage practice, every soil type, and every residue condition, so you can choose the one that’s right for you.
Page 5
BOLT TORQUE Before operating the Titan Residue Manager for the first time, check to be sure that all hardware is tight. Check all hardware again after approximately 50 hours of operation and at the beginning of each planting season. All hardware used on the Titan Residue Manager is Grade 5 unless otherwise noted. Grade 5 cap screws are marked with three radial lines on the head.
Page 6
INSTALLATION INSTRUCTIONS 15" PLANTER BLADES 15" PLANTER BLADES JD 7000, KINZE, JD 1700, 7200, AND 7300 PLANTERS ALL WHITE 6000 AND 9000 PRO AND PLUS SERIES PLANTERS BOLT BOLT POSITION # POSITION # 1-1/2" ABOVE 1" ABOVE 1" ABOVE 5/8" ABOVE 16"...
Page 7
INSTALLATION INSTRUCTIONS STEP 1. Attach the coulter bracket to the planter unit using (3) ½” x 1-1/2” bolts and lock nuts. Do no fully tighten hardware, coulter blade alignment to the planter opener will need to be done later. STEP 2. Attach the 2960-133 arm assembly to the coulter bracket using the 5/8” x 2” bolts, 1 5/8”...
Page 8
INSTALLATION INSTRUCTIONS NOTE: For models with residue managers go to STEP 4. STEP 3. For coulter only models, Attach the blade to the coulter arm assembly using the 4) ½” x 1-1/4” carriage bolts, hex nuts, and lock washers. Fully tighten the carriage bolts. Torque to 85 ft/lbs.
Page 9
INSTALLATION INSTRUCTIONS STEP 5. Attach the residue manager assembly to the coulter bracket using the 5/8” x 2- 1/4” bolt, 6000-335 bushing, 2527-562 shim, 2960-401 adjustment support plate, 5/8 lock nut and the ½” x 2” bolt, 2967-622 spacer, 2527-562 shim and ½” locknut. Install the 2984-326 adjustment pin and 2570-448 hair pin cotter.
Page 10
INSTALLATION INSTRUCTIONS STEP 7. Attach the blade to the coulter arm assembly using the 4) ½” x 1-1/4” carriage bolts, lock washers and hex nuts. Torque to 85 ft./lbs.
INSTALLATION INSTRUCTIONS STEP 8. Choose the mounting hole in which to attach the residue manage wheels. Both wheels mounted in the front holes – wheels are interlocked. One wheel mounted in the rear hole – wheels are offset. Both wheels mounted in the rear holes – wheels are spaced apart.
OPERATION 1. Set/mount coulter blades to run perpendicular to the soil. Operation depth and blade wear can be affected if the coulter is mounted crooked or if the toolbar is not level side to side. 2. After a few hours of use, check all bolts for tightness and proper torque. 3.
Page 13
OPERATION CAUTION: Where rocks are present the residue manager should be set in the “float” position, not locked down. Adjust the residue manager to move crop residue aside and not move any soil. Adjustments to the residue manager may have to be made when changing field conditions and type and amount of residue.
Page 18
PARTS IDENTIFICATION 13” BEVEL WHEEL 2966-117-BW (SHOWN) 2966-116-BW...
Page 19
PARTS IDENTIFICATION 13” SHARK WHEEL 2966-117-ST-FW (SHOWN) 2966-116-ST-FW...
Page 20
PART IDENTIFICATION 2967-901 ® CLEANSWEEP CYLINDER MOUNT Note: Kinze 2000-3000, White 6000, JD 7000 with Clean Sweep™ Kit 755185 MUST USE 2967-901 mount kit. Clean Sweep parts can be ordered separately per row from Precision Planting: 2) 95207 Bolt 1) 755019 Pin 2) 755028 Cotter Pin 1) 755148 Bracket 1) 755023 Air Cylinder...
TROUBLESHOOTING Problem Cause Solution Cannot adjust coulter Planter frame not set Ensure that in operation depth shallow enough. correctly. the planter frame is at correct height (20”-22”) and level the toolbar, refer to opposite page. Blade must be 16” Coulter blade is too big. diameter or smaller.
IMPORTANT: failure to properly set the planter frame height and levelness can result in less than successful operation of the planter and the Yetter product and may result in damaged equipment. All operators should read and thoroughly understand the instructions given prior to using the Yetter product.
PLANTER HEIGHT ADJUSTMENT Figure A. – The planter hitch and frame are both 20” off the ground. To ensure this, visually check to see that the planter boxes are level and that the planter unit parallel arms are also parallel with the ground. When using planter attachments located in front of the planter unit, this setting is very important.